Revision history of "Comprehensive energy modernisation of the SARL office building in Stargard Street. First Brigade 35." (Q137638)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 89,451 bytes +4 Changed label, description and/or aliases in pt
  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 89,447 bytes +122 Set a claim value: summary (P836): Execução do projeto Mon. «Modernização energética global do edifício de escritórios da SARL em Stargard Street. A primeira Brigada de 35 "é estacionária e incluirá as seguintes obras: 1. Modernização global do sistema de aquecimento central, incluindo a substituição de radiadores, fios, hermetização, regulação total, instalação de válvulas termostáticas P-1K e válvulas de estofos. Modernização abrangente do nó de calor equipado com automação de temp...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 86,152 bytes −1,489 Changed label, description and/or aliases in lv, sk, da, fr, fi, cs, et, ga, pt, lt, sl, bg, ro, hu, hr, es, mt, sv, nl, el, de, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:5900:59, 3 July 2022DG Regio talk contribs 85,521 bytes +55,760 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:3021:30, 2 December 2021DG Regio talk contribs 17,504 bytes +3,116 Created claim: summary (P836): Mise en œuvre du projet intitulé «Modernisation énergétique globale du bâtiment de bureaux SARL à Stargard à ul. La Première Brigade 35" est stationnaire et comprendra les travaux suivants: 1. Modernisation complète des installations de chauffage central, y compris le remplacement des radiateurs, le câblage, l’encapsulation, le réglage complet, l’installation des vannes thermostatiques P-1K et des vannes pour le réglage vertical. Modernisation c...
  • curprev 21:3021:30, 2 December 2021DG Regio talk contribs 14,388 bytes +167 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 14,660 bytes +160 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 14,500 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 14,655 bytes +2,826 Created claim: summary (P836): Implementation of the project Mon. “Comprehensive energy modernisation of the SARL office building in Stargard Street. The first 35" Brigade is stationary and will include the following works: 1. Comprehensive modernisation of the central heating system, including the replacement of radiators, wires, hermetisation, full adjustment, installation of P-1K thermostatic valves and upholstery valves. Comprehensive modernisation of the heat node equipp...
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 11,829 bytes −2,354 Removed claim: summary (P836): Implementation of the project: ‘A comprehensive energy renovation of the office building SARL in Stargard, ul. The first Brigade 35 is a stationary one and will include the following works: 1. A comprehensive modernisation of the heating system including replacement of radiators, pipes, encapsulation, full regulation, installation of thermostatic valves P-1K and vertical adjustment valves. A comprehensive modernisation of the thermal hub equip...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,900 bytes +2,354 Created claim: summary (P836): Implementation of the project: ‘A comprehensive energy renovation of the office building SARL in Stargard, ul. The first Brigade 35 is a stationary one and will include the following works: 1. A comprehensive modernisation of the heating system including replacement of radiators, pipes, encapsulation, full regulation, installation of thermostatic valves P-1K and vertical adjustment valves. A comprehensive modernisation of the thermal hub equippe...

25 February 2020

18 February 2020

31 January 2020

14 January 2020