Revision history of "Thermomodernisation of the public utility building – office: Hospital 4 in Barlink" (Q137617)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 82,934 bytes +1 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 82,933 bytes −291 Set a claim value: summary (P836): Como parte do investimento, está prevista a modernização energética do edifício de serviços públicos para o escritório da BTBS em ul. Hospital 4 em Barlink. Finalmente, está previsto que os seguintes elementos sejam incluídos no âmbito da obra:a) Acabamento exterior:1)O isolamento das paredes exteriores por meio de um método de poliuretano de 13 cm com uma camada de isopor EPS 100.2) Aquecimento do teto completo a partir do exterior da estrutura com...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 80,050 bytes +3,100 Changed label, description and/or aliases in lv, da, ro, fr, it, hr, cs, bg, sk, sl, et, es, lt, de, fi, el, ga, sv, nl, pt, hu, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:5700:57, 3 July 2022DG Regio talk contribs 74,830 bytes +46,153 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:3321:33, 2 December 2021DG Regio talk contribs 16,449 bytes +2,478 Created claim: summary (P836): Dans le cadre de l’investissement, il est prévu de moderniser le bâtiment d’utilité publique au bureau des BTB à ul. Hôpital 4 à Barlink.Enfin, il est prévu que les éléments suivants seront inclus dans le champ d’application de l’ouvrage: a) Finition extérieure: 1)Veuillement des parois extérieures par une méthode sans couture de 13 cm de mousse de mousse EPS 100.2) Réchauffement du sol plein de l’extérieur de la structure à l’aide de polystyrèn...
  • curprev 21:3321:33, 2 December 2021DG Regio talk contribs 13,971 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0719:07, 21 October 2020DG Regio talk contribs 14,278 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0719:07, 21 October 2020DG Regio talk contribs 14,135 bytes −136 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0719:07, 21 October 2020DG Regio talk contribs 14,271 bytes +2,377 Created claim: summary (P836): As part of the investment, energy modernisation of the public utility building is planned for BTBS office at ul. Hospital 4 in Barlink. Finally, it is planned that the following elements will be included in the scope of the work:a) Exterior finish:1)The insulation of the outer walls by means of a polyurethane method of 13 cm with a layer of Styrofoam EPS 100.2) Warming of the full ceiling from the outside of the structure with the use of polysty...
  • curprev 19:0719:07, 21 October 2020DG Regio talk contribs 11,894 bytes −1,839 Removed claim: summary (P836): The investment is planned to modernise the public utility of the BTBS office at ul. Within the scope of the work, it is planned that the following elements are to be included in the scope of the work: (a) External finishing: (1) the insulation of the outer walls by a solution of 4 cm in the outer ring of the EPS. (100.2) insulation of the full-blown laminate (styropate) of gr.22 cm with a coefficient of thermal conductivity? = 0,040 W/mK, and...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0710:07, 11 March 2020DG Regio talk contribs 12,451 bytes +1,839 Created claim: summary (P836): The investment is planned to modernise the public utility of the BTBS office at ul. Within the scope of the work, it is planned that the following elements are to be included in the scope of the work: (a) External finishing: (1) the insulation of the outer walls by a solution of 4 cm in the outer ring of the EPS. (100.2) insulation of the full-blown laminate (styropate) of gr.22 cm with a coefficient of thermal conductivity? = 0,040 W/mK, and th...

25 February 2020

18 February 2020

31 January 2020

14 January 2020