Revision history of "“Creation of an integrated, low-carbon public transport system in the Central Zone”" (Q137597)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 59,777 bytes +1 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 59,776 bytes +8 Set a claim value: summary (P836): O projeto diz respeito à aquisição de meios de transporte para o sistema de transportes públicos na área de 13 municípios que formam o SC. Abrange 4 tarefas: Tarefa 1. Trabalhos preparatórios (elaboração de um estudo de viabilidade do projecto): 27.10.2016-16.1.2017r., Tarefa 2. Aquisição de 16 veículos para transportes públicos em SC, incluindo a aquisição de 16 novos meios de transporte urbanos conformes com a norma de emissões EURO 6, condução: g...

20 March 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 19:5219:52, 2 March 2023DG Regio talk contribs 57,317 bytes −578 Changed label, description and/or aliases in da, it, lv, sk, ro, fi, pt, ga, et, lt, es, hr, fr, el, nl, hu, sl, cs, bg, de, mt, sv, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:2818:28, 27 July 2022DG Regio talk contribs 55,813 bytes +34,721 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:3221:32, 2 December 2021DG Regio talk contribs 13,699 bytes +1,672 Created claim: summary (P836): Le projet concerne l’achat de moyens de transport pour le système de transport public dans la zone de 13 communes formant SC. Il couvre 4 tâches: Activité 1. Travaux préparatoires (préparation d’une étude de faisabilité): 27.10.2016-16.01.2017,Tâche 2. Achat de 16 véhicules pour les transports publics en SC, consistant en l’achat de 16 véhicules de transport urbain neufs répondant à la norme EURO 6 sur les émissions d’échappement, propulsion: di...
  • curprev 21:3221:32, 2 December 2021DG Regio talk contribs 12,027 bytes +161 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5518:55, 21 October 2020DG Regio talk contribs 12,305 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5518:55, 21 October 2020DG Regio talk contribs 12,159 bytes −153 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5518:55, 21 October 2020DG Regio talk contribs 12,312 bytes +1,612 Created claim: summary (P836): The project concerns the purchase of means of transport for the public transport system in the area of 13 municipalities forming SC.It covers 4 tasks: Task 1. Preparatory work (drawing of a feasibility study of the project): 27.10.2016-16.01.2017r., Task 2. Purchase of 16 vehicles for public transport in SC, including the purchase of 16 new urban means of transport complying with the emission standard EURO 6, drive: diesel, of which: 7 20-bed bu...
  • curprev 18:5518:55, 21 October 2020DG Regio talk contribs 10,700 bytes −1,095 Removed claim: summary (P836): The project concerns the purchase of means of transport for the purposes of the public transport system in the 13 communes forming SC.Obez 4 tasks: Target 1. Preparatory work (drawing up a feasibility study): 27.10.2016-16.01.2017, Task 2. Purchase of 16 vehicles for public transport in SC, including the purchase of 16 new urban transport vehicles complying with the EURO 6 emission standard, propulsion: diesel, of which: 7 minibuses, 9 buses,...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 10,501 bytes +1,095 Created claim: summary (P836): The project concerns the purchase of means of transport for the purposes of the public transport system in the 13 communes forming SC.Obez 4 tasks: Target 1. Preparatory work (drawing up a feasibility study): 27.10.2016-16.01.2017, Task 2. Purchase of 16 vehicles for public transport in SC, including the purchase of 16 new urban transport vehicles complying with the EURO 6 emission standard, propulsion: diesel, of which: 7 minibuses, 9 buses, 40...

25 February 2020

18 February 2020

31 January 2020

14 January 2020