Revision history of "Completion of the network of bicycle roads within voivodship road No. 172 in Szczczecinek" (Q137588)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 77,458 bytes −11 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 77,469 bytes −3 Set a claim value: summary (P836): no âmbito do projeto, será construída uma estrada para bicicletas ao longo da estrada provincial n.o 172 e ao longo da rua Wypoczynkowa, em Szczecinek, com um comprimento total de 2,73 km. Será construída uma ciclovia com uma largura de 2,0 m. Na faixa da estrada de voivodia n.o 172, o caminho será adjacente às estradas terrestres existentes, estradas auxiliares e estará localizado na zona verde. A estrada para bicicletas terá início no cruzamento d...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 74,298 bytes +447 Changed label, description and/or aliases in da, it, sk, et, lv, lt, es, fr, pt, sv, fi, ga, bg, de, nl, cs, el, sl, hr, ro, mt, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:5300:53, 3 July 2022DG Regio talk contribs 71,727 bytes +45,309 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1221:12, 2 December 2021DG Regio talk contribs 15,964 bytes +2,504 Created claim: summary (P836): dans le cadre matériel du projet, une route cyclable sera construite le long de la route provinciale no 172 et le long de la rue Wypoczynkowa à Szczecinek d’une longueur totale de 2,73 km. Une route cyclable bidirectionnelle d’une largeur de 2,0 m sera réalisée. Sur la voie de la route provinciale no 172, le chemin sera adjacent aux routes terrestres existantes, aux routes auxiliaires et sera situé dans la voie verte. La route cyclable commencer...
  • curprev 21:1221:12, 2 December 2021DG Regio talk contribs 13,460 bytes +149 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 13,750 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 13,602 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 13,737 bytes +2,333 Created claim: summary (P836): within the scope of the project, a bicycle road will be built along the provincial road no. 172 and along Wypoczynkowa Street in Szczecinek with a total length of 2.73 km. A bicycle road with a width of 2.0 m will be made. In the lane of the voivodeship road No. 172 the path will be adjacent to the existing ground roads, auxiliary roads and will be located in the green zone. The bicycle road will begin within the junction of DW172 with the exten...
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 11,404 bytes −1,782 Removed claim: summary (P836): the material scope of the project will be built on the cycle road along provincial road No 172 and on a holiday in Szczecinek with a total length of 2.73 km. A cycle path of 2.0 m for the cycle will be made. on the road, provincial road No 172 will adhere to the existing land, support roads and will be in the green belt. The cycle path will start within the junction of the DW172 junction with the extension of the Kołobrzeg street (Montopśne St...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 11,903 bytes +1,782 Created claim: summary (P836): the material scope of the project will be built on the cycle road along provincial road No 172 and on a holiday in Szczecinek with a total length of 2.73 km. A cycle path of 2.0 m for the cycle will be made. on the road, provincial road No 172 will adhere to the existing land, support roads and will be in the green belt. The cycle path will start within the junction of the DW172 junction with the extension of the Kołobrzeg street (Montopśne Stre...

25 February 2020

18 February 2020

31 January 2020

14 January 2020