Revision history of "Construction and equipment of the infrastructure of the integrated public transport system i.e. a multimodal interchange centre together with the information and communication service centre in Guestno" (Q137582)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 78,081 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 78,081 bytes −129 Set a claim value: summary (P836): O investimento consistirá no desenvolvimento de locais dedicados à construção e ao equipamento da infraestrutura do sistema integrado de transportes públicos, ou seja, um centro de intercâmbio multimodal com um centro de serviços de informação e comunicação composto por: — construção do principal centro de ligação em Guestno. O principal centro de intercâmbio em Guestno será o nó de intercâmbio (comboio/estação) com caixa e informações públicas na G...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 75,036 bytes +1,718 Changed label, description and/or aliases in it, sk, da, lv, fi, fr, et, cs, ga, pt, sl, lt, bg, ro, hu, hr, nl, es, mt, sv, el, de, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:5300:53, 3 July 2022DG Regio talk contribs 71,195 bytes +45,108 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1221:12, 2 December 2021DG Regio talk contribs 15,829 bytes +2,419 Created claim: summary (P836): L’investissement consistera en le développement de domaines dédiés à la mise en œuvre de la mission de construction et d’équipement des infrastructures d’un système de transport public intégré, c’est-à-dire d’un centre de transfert multimodal et d’un centre de services d’information et de communication, comprenant: — construction du principal centre de basculement à Gościnie. Le principal centre de transition de Gościnie sera un centre de liaiso...
  • curprev 21:1221:12, 2 December 2021DG Regio talk contribs 13,410 bytes +271 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 13,578 bytes +261 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 13,317 bytes −267 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 13,584 bytes +2,170 Created claim: summary (P836): The investment will consist of the development of sites dedicated to the construction and equipment of the infrastructure facility of the integrated public transport system, i.e. a multimodal interchange centre with an information and communication service centre consisting of: — construction of the main connecting centre in Guestno. The main interchange centre in Guestno will be the interchange node (train/station) with cash desk and public inf...
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 11,414 bytes −1,735 Removed claim: summary (P836): The investment will consist of the development of the areas for the construction and fitting-out of the infrastructure facility of the integrated public transport system, i.e. the multimodal connecting centre, together with the information and communication service centre, consisting of: The construction of the main hub for the host. The main hub of the connecting hub will not be a connecting hub (station/station) with cash and public informat...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 11,867 bytes +1,735 Created claim: summary (P836): The investment will consist of the development of the areas for the construction and fitting-out of the infrastructure facility of the integrated public transport system, i.e. the multimodal connecting centre, together with the information and communication service centre, consisting of: The construction of the main hub for the host. The main hub of the connecting hub will not be a connecting hub (station/station) with cash and public informatio...

25 February 2020

18 February 2020

31 January 2020

14 January 2020