Revision history of "Integrated Interchange Centre in Gryfin" (Q137566)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 51,012 bytes −4 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 51,016 bytes +23 Set a claim value: summary (P836): O projeto é um projeto estacionário de uma etapa. De acordo com o objeto admissível para os projetos do tipo 1, estava prevista a construção de um centro de transferência, uma ponte pedonal que os ligasse a povoações residenciais situadas na chamada «residência». Taras Superiores, construção do parque de estacionamento P&R no interior da ul. Caminho-de-ferro, construção de espaços B &R, construção de um parque de estacionamento na ul. 1 de Maio e re...

7 March 2024

15 January 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 47,819 bytes +530 Changed label, description and/or aliases in lv, it, da, bg, sk, ro, et, de, pt, cs, ga, sv, lt, hu, sl, es, hr, mt, fi, nl, fr, el, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:5200:52, 3 July 2022DG Regio talk contribs 45,160 bytes +26,881 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1121:11, 2 December 2021DG Regio talk contribs 12,517 bytes +1,389 Created claim: summary (P836): Le projet est un projet stationnaire, mis en œuvre en une seule étape. Conformément à l’objet admissible pour les projets de type 1, elle prévoit de construire un centre de transfert, une passerelle qui les relie à des logements résidentiels situés sur ce que l’on appelle le projet. Terrasse supérieure, construction du parking P&R dans la rue. Chemin de fer, construction de places B&R, construction d’un parking à ul. 1er mai et reconstruction de...
  • curprev 21:1121:11, 2 December 2021DG Regio talk contribs 11,128 bytes +101 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 11,466 bytes +98 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 11,368 bytes −85 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 11,453 bytes +1,317 Created claim: summary (P836): The project is a stationary one-step project. According to the permissible subject-matter for Type 1 projects, the construction of a transfer centre, a footbridge linking them to residential settlements located on the so-called “residence” was planned. Upper Taras, construction of the car park P&R within ul. Railway, construction of B &R spaces, construction of a parking lot at ul. 1 May and reconstruction of ul. Allied and 1 May and exchange of...
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 10,136 bytes −865 Removed claim: summary (P836): The project is stationary in its one-step nature. According to the permissible object for Type 1 projects, it is planned to construct a hub, connecting them to residential settlements located in so called “residential areas”. The upper terrace, the construction of the P & R car park within the ul. Construction of B & R seats, construction of a car park at ul. On 1 May and the reconstruction of ul. Allied and 1 May and the replacement of 36 at...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 9,712 bytes +865 Created claim: summary (P836): The project is stationary in its one-step nature. According to the permissible object for Type 1 projects, it is planned to construct a hub, connecting them to residential settlements located in so called “residential areas”. The upper terrace, the construction of the P & R car park within the ul. Construction of B & R seats, construction of a car park at ul. On 1 May and the reconstruction of ul. Allied and 1 May and the replacement of 36 at bu...

25 February 2020

18 February 2020

31 January 2020

14 January 2020