Revision history of "Construction of an integrated interchange junction with a multifunctional railway and bus station in Goleniów" (Q137562)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

3 November 2022

27 October 2022

26 October 2022

21 October 2022

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1121:11, 2 December 2021DG Regio talk contribs 17,402 bytes +3,080 Created claim: summary (P836): Le demandeur du projet et l’entité responsable de sa mise en œuvre sont Goleniów. En raison de la nécessité de repenser une partie de la portée, le projet sera mis en œuvre en mode «conception et construction». Le champ d’application matériel comprend la construction d’un centre de transport, d’une gare ferroviaire multifonctionnelle et d’une gare routière dotée d’installations internes/externes. (consommation dans le cadre de l’UGP); tunnel ave...
  • curprev 21:1121:11, 2 December 2021DG Regio talk contribs 14,322 bytes +164 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 14,597 bytes +170 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 14,427 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 14,581 bytes +2,811 Created claim: summary (P836): The project applicant and the entity responsible for its implementation is Gm. Goleniów. Due to the need to redesign part of the scope, the project will be implemented in the “design and build” mode. The material scope includes the construction of a transport hub, a multifunctional railway and bus station with internal installations. (dimension within the PFU); a pedestrian tunnel (change within the PFU); land development (including the construc...
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 11,770 bytes −2,395 Removed claim: summary (P836): The applicant of the project and the entity responsible for its implementation are Gum Goleniów. Due to the need to redesign the part of the material scope, the project will be carried out in a “design and demolition” mode. The material scope consists of the construction of a communication hub, a multifunctional railway station — bus and coach, and the installation of the vehicle/power station. (municipality within the PFU); pedestrian crossin...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 12,879 bytes +2,395 Created claim: summary (P836): The applicant of the project and the entity responsible for its implementation are Gum Goleniów. Due to the need to redesign the part of the material scope, the project will be carried out in a “design and demolition” mode. The material scope consists of the construction of a communication hub, a multifunctional railway station — bus and coach, and the installation of the vehicle/power station. (municipality within the PFU); pedestrian crossing...

25 February 2020

18 February 2020

31 January 2020

14 January 2020