Revision history of "Construction of a transfer place at the intersection of Na Świdwie and Eastern Streets in Łęgi" (Q137552)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 60,076 bytes +8 Changed label, description and/or aliases in pt
  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 60,068 bytes +5 Set a claim value: summary (P836): O investimento envolve a construção do Interchange Facility (MP) na intersecção das ruas Na Świdwie e Eastern na cidade de Łęgi e o desenvolvimento da área em torno da infraestrutura recém-criada. O âmbito de aplicação material inclui, nomeadamente, a criação de uma baía de autocarros – uma paragem de transportes públicos para as linhas diurnas 122, 123 e as linhas noturnas n.o 535; Abrigos de paragem; parque de estacionamento do tipo B&R com bicicl...

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 56,889 bytes +198 Changed label, description and/or aliases in da, it, sk, lv, hr, et, cs, fi, hu, ro, de, es, fr, lt, ga, sv, mt, el, sl, nl, pt, bg, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:2818:28, 27 July 2022DG Regio talk contribs 54,574 bytes +33,411 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1021:10, 2 December 2021DG Regio talk contribs 13,683 bytes +1,763 Created claim: summary (P836): L’investissement comprend la construction du site de transaction (MP) à l’intersection de Na Świdwie et des rues orientales de Łęgi et le développement de la zone autour de l’infrastructure nouvellement créée. Le champ d’application matériel comprend, entre autres, la création d’une baie d’autobus — un arrêt de transport en commun pour les lignes de jour 122 et 123 et les lignes de nuit 535; un hangar d’arrêts; un parking de type B&R avec remise...
  • curprev 21:1021:10, 2 December 2021DG Regio talk contribs 11,920 bytes +163 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 12,196 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 12,040 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 12,195 bytes +1,616 Created claim: summary (P836): The investment involves the construction of the Interchange Facility (MP) within the intersection of Na Świdwie and Eastern Streets in the town of Łęgi and the development of the area around the newly created infrastructure. The material scope includes, among others, the creation of a bus bay – a public transport stop for day lines 122, 123 and night lines No. 535; stop shelters; car park type B&R with world bicycles for 12 bicycles; pavements,...
  • curprev 18:5418:54, 21 October 2020DG Regio talk contribs 10,579 bytes −1,158 Removed claim: summary (P836): The investment involves the construction of the meeting area (MP) in the intersection of the streets of Na Świdtwo and East in the town of Łęgi and the development of the area around the newly built infrastructure. The material scope includes, inter alia, the development of a bus bay — a public transport stop for daily lines No 122, 123 and night No 535; wind shelters; a type B & R car park with bicycle wind for 12 bicycles; pavements as well...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 10,445 bytes +1,158 Created claim: summary (P836): The investment involves the construction of the meeting area (MP) in the intersection of the streets of Na Świdtwo and East in the town of Łęgi and the development of the area around the newly built infrastructure. The material scope includes, inter alia, the development of a bus bay — a public transport stop for daily lines No 122, 123 and night No 535; wind shelters; a type B & R car park with bicycle wind for 12 bicycles; pavements as well as...

25 February 2020

18 February 2020

31 January 2020

14 January 2020