Revision history of "Integration of the public transport system through the construction of a bicycle path from the transport hub of Goleniów Industrial Park to the system of cycle paths towards the railway station “Goleniów”" (Q137543)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:5722:57, 2 March 2023DG Regio talk contribs 92,976 bytes −3,319 Changed label, description and/or aliases in it, sk, fi, bg, de, lv, et, cs, pt, ro, fr, ga, sl, es, hu, sv, el, mt, lt, nl, hr, da, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:5000:50, 3 July 2022DG Regio talk contribs 94,170 bytes +62,811 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:0921:09, 2 December 2021DG Regio talk contribs 18,075 bytes +3,168 Created claim: summary (P836): La tâche analysée: «L’intégration du réseau de transports en commun par la construction d’une piste cyclable entre le parc industriel de Goleniów et le réseau de pistes cyclables en direction de la gare de Goleniów comprend: 1. Reconstruction de l’ul. Une ligne droite à Łozienica composée de: 1.1. construction d’une piste piétonne-vélo avec raccordement au sentier existant dans la rue. Nouveau, 1.2. exécution des ponceaux sur les parcours, 1.3....
  • curprev 21:0921:09, 2 December 2021DG Regio talk contribs 14,907 bytes +274 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 15,072 bytes +270 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 14,802 bytes −224 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 15,026 bytes +2,994 Created claim: summary (P836): The analysed task Mon: “Integration of the public transport system through the construction of a foot-bike path from the transport hub Goleniów Industrial Park to the system of foot-bike paths towards the railway station "Goleniów" includes its scope: 1. Redevelopment of St. A straight in Łozienica consisting of: 1.1. construction of a foot-bike path with connection to the existing path on ul. New, 1.2. execution of culverts on watercourses, 1.3...
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 12,032 bytes −2,469 Removed claim: summary (P836): The following task: ‘The integration of the public transport system by building a pedestrian path from the Goleniów industrial park junction to a system for pedestrians and cyclists in the direction of ‘Goleniów’’ comprises its scope: 1. Reconstruction ul. Latvians, which consists of: 1.1. constructing a pedestrian/cycling path with a link to an existing path on the street New, 1.2th culverts on courses, 1.3. upgrades of bus platforms, strike...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 13,210 bytes +2,469 Created claim: summary (P836): The following task: ‘The integration of the public transport system by building a pedestrian path from the Goleniów industrial park junction to a system for pedestrians and cyclists in the direction of ‘Goleniów’’ comprises its scope: 1. Reconstruction ul. Latvians, which consists of: 1.1. constructing a pedestrian/cycling path with a link to an existing path on the street New, 1.2th culverts on courses, 1.3. upgrades of bus platforms, strike by...

25 February 2020

18 February 2020

31 January 2020

14 January 2020