Revision history of "Construction of a bicycle path from Nowielice to Trzebusz and Mrzeżyno" (Q137536)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:4900:49, 3 July 2022DG Regio talk contribs 80,437 bytes +52,029 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:0921:09, 2 December 2021DG Regio talk contribs 16,765 bytes +2,850 Created claim: summary (P836): Le projet est stationnaire. Les terrains destinés à la construction passent par des parcelles avec un numéro géodésique: 13 et 5/1 (zone de Novelice), 494/9, 495, 598 et 602 (à Trzebusz), 60 633 et 112 (à Roba) et 103 (à Mrzezyno-3). L’objet du projet est la construction d’une piste cyclable le long de la route Nowielice — Mrzeżyno, le sentier a été délimité après l’ancien remblai ferroviaire. Le chemin sera construit sur une sous-structure d’ag...
  • curprev 21:0921:09, 2 December 2021DG Regio talk contribs 13,915 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 14,222 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 14,092 bytes −153 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 14,245 bytes +2,626 Created claim: summary (P836): The project is stationary. The areas intended for construction pass through the geodetic plots: 13 and 5/1 (Nowielice region), 494/9, 495, 598 and 602 (within the Tribush), 60.633 and 112 (within Roba) and 103 (within Mrzezyno-3). The object of the project is the construction of a bicycle path on the Nowielice – Mrzeżyno route, the path was marked by the old railway embankment. The path will be built on a crumble foundation and will have a bitum...
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 11,619 bytes −2,159 Removed claim: summary (P836): The project is stationary. The land used for construction shall be carried out by land plots: 13 and 5/1 (nosoce), 494/9, 495, 598 and 602 (in Trzebuz), 60,633 and 112 (within Roby) and 103 (within the region of Mózino-3). The project involves the construction of a cycle path on the Nwielice route — Manzżyno, the path is established on the basis of the old rail embankment. The path will be constructed on the subconstruction of aggregates and w...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 12,488 bytes +2,159 Created claim: summary (P836): The project is stationary. The land used for construction shall be carried out by land plots: 13 and 5/1 (nosoce), 494/9, 495, 598 and 602 (in Trzebuz), 60,633 and 112 (within Roby) and 103 (within the region of Mózino-3). The project involves the construction of a cycle path on the Nwielice route — Manzżyno, the path is established on the basis of the old rail embankment. The path will be constructed on the subconstruction of aggregates and wil...

25 February 2020

18 February 2020

31 January 2020

14 January 2020