Revision history of "Construction and reconstruction of the bicycle path from Stargardzka Street in Goleniów through Podańsko village towards Danów, Goleniów Municipality" (Q137529)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4505:45, 10 October 2024DG Regio talk contribs 67,187 bytes +13 Changed label, description and/or aliases in pt
  • curprev 05:4505:45, 10 October 2024DG Regio talk contribs 67,174 bytes +16 Set a claim value: summary (P836): O investimento abrangido por este estudo envolve a construção de uma ciclovia a partir da rua Stargardzka, em Goleniów, que, desde o início da área não construída, vai para a ciclovia em direção a Danów através de Podańsko. A secção planeada da ciclovia que corre fora da área da cidade (Podańsko) em direção a Goleniów e, em seguida, ao longo da rua Stargardzka, ligada à ciclovia existente ligada ao centro da cidade e à estação ferroviária, conduz a...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 63,984 bytes −1,168 Changed label, description and/or aliases in ro, lv, it, fr, da, el, fi, es, et, cs, sk, ga, pt, lt, hu, hr, sv, de, sl, bg, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:4800:48, 3 July 2022DG Regio talk contribs 63,030 bytes +39,593 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 14,768 bytes +1,997 Created claim: summary (P836): L’investissement couvert par cette étude concerne la construction d’une piste cyclable à partir de la rue Stargardzka à Goleniów, qui se transforme, dès le début de la zone non développée, en une route cyclable qui mène à Danów à travers le village de Podańsko. Le tronçon prévu de la route cyclable en dehors de la zone urbaine (Podańsko) en direction de Goleniów, puis le long de la rue Stargardzka, reliée à la piste cyclable existante reliée au...
  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 12,771 bytes +238 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 12,972 bytes +213 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 12,759 bytes −212 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 12,971 bytes +1,922 Created claim: summary (P836): The investment covered by this study involves the construction of a bicycle path from Stargardzka Street in Goleniów, which then, since the start of the unbuilt area, is going to the bicycle road running towards Danów through Podańsko. The planned section of the bicycle road running outside the city area (Podańsko) towards Goleniów and then along Stargardzka Street connected with the existing bicycle path connected with the city centre and furth...
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 11,049 bytes −1,375 Removed claim: summary (P836): The investment covered by this study involves the construction of a cycle path from the Stargard Street in Goleniów, which goes on to go into the road for the bicycles running through the village of Podazeńsko. The projected stretch of the cycle road outside the urban area (Podazeńsko) in the goal-direction area, and then in the Stargard Street, connected to the existing bicycle path from the city centre and further to the PKP Dwort, leads to...

25 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 11,132 bytes +1,375 Created claim: summary (P836): The investment covered by this study involves the construction of a cycle path from the Stargard Street in Goleniów, which goes on to go into the road for the bicycles running through the village of Podazeńsko. The projected stretch of the cycle road outside the urban area (Podazeńsko) in the goal-direction area, and then in the Stargard Street, connected to the existing bicycle path from the city centre and further to the PKP Dwort, leads to an...

25 February 2020

18 February 2020

31 January 2020

14 January 2020