Revision history of "Construction of roads for bicycles in Szczecin within ul. 26 April with the necessary connections to existing infrastructure" (Q137527)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 61,073 bytes +15 Changed label, description and/or aliases in pt
  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 61,058 bytes +12 Set a claim value: summary (P836): O tema do projecto é a construção de estradas para bicicletas na rua. 26 de Abril com as ligações necessárias ao infrastr existente. O projeto pressupõe: a construção de uma estrada para bicicletas e uma calçada no lado norte das ruas Krzywoustego-26 de abril, juntamente com a realização destas rotas de transporte através de intersecções e através das passagens existentes. Prevê: Reconstrução das convenções existentes, mudança da organização do tráf...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:4800:48, 3 July 2022DG Regio talk contribs 55,929 bytes +34,594 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 13,817 bytes +1,683 Created claim: summary (P836): L’objet du projet est la construction de routes pour vélos dans la rue. 26 avril avec les connexions nécessaires à l’infrastr existant. Projecteur: La route pour vélos et un trottoir du côté nord des rues Krzywoustego-26 avril, avec le passage de ces routes à travers les intersections et à travers le passage existant. Il est prévu: reconstruction des sorties existantes, changement d’organisation de la circulation, amélioration de la sécurité de...
  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 12,134 bytes +205 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 12,368 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 12,184 bytes −178 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 12,362 bytes +1,675 Created claim: summary (P836): The subject of the project is the construction of roads for bicycles in the street. 26 April with the necessary connections to existing infrastr. The project assumes: the construction of a road for bicycles and a sidewalk on the north side of Krzywoustego-26 April streets along with the carrying out of these transport routes through intersections and through the existing passageways. It provides for: reconstruction of existing conventions, chang...
  • curprev 18:5318:53, 21 October 2020DG Regio talk contribs 10,687 bytes −1,183 Removed claim: summary (P836): The object of the project is the construction of roads for bicycles on ul. 26 April with the necessary connections to the existing infrastructure. Proprojeck zakłada:budowę road for bicycles and the pavement on the northern side of Krzywusteg-26 April street with the intersection of these lines through the crossings and through the existing passage. Scheduled for: the upgrading of existing exits, modification of traffic organisation improving...

24 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 10,577 bytes +1,183 Created claim: summary (P836): The object of the project is the construction of roads for bicycles on ul. 26 April with the necessary connections to the existing infrastructure. Proprojeck zakłada:budowę road for bicycles and the pavement on the northern side of Krzywusteg-26 April street with the intersection of these lines through the crossings and through the existing passage. Scheduled for: the upgrading of existing exits, modification of traffic organisation improving th...

25 February 2020

18 February 2020

31 January 2020

14 January 2020