Revision history of "Strengthening the investment areas of “Old Tartak” in Barlink for the development of tourism activities" (Q137466)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 75,738 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 75,739 bytes −827 Set a claim value: summary (P836): O projeto terá por objeto o desenvolvimento e o armamento das zonas de investimento «Old Tartak» em Barlink, que visam aumentar a atratividade e a acessibilidade das zonas de investimento na região do Kosovo. Âmbito de aplicação material: execução da estrada interior ao lado de ul. O lago e a infraestrutura subterrânea: abastecimento de água, saneamento e drenagem de águas pluviais, incluindo a construção da estação de bombagem e o seu fornecimento...

12 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 73,392 bytes +13,125 Changed label, description and/or aliases in lv, it, sk, da, ro, fi, es, ga, lt, sv, el, fr, hr, et, pt, nl, hu, sl, bg, cs, mt, de, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:4200:42, 3 July 2022DG Regio talk contribs 58,147 bytes +33,212 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1321:13, 2 December 2021DG Regio talk contribs 14,948 bytes +2,453 Created claim: summary (P836): L’objet du projet sera le développement et l’armement de sites d’investissement «Old Tartak» à BarLink, afin d’accroître l’attractivité et l’accessibilité des zones d’investissement dans la zone couverte par le KS. Champ d’application matériel: construction de la route intérieure à partir de ul. Infrastructures du lac et du sous-sol: approvisionnement en eau, assainissement et système d’eau de pluie, ainsi que la construction de stations de pomp...
  • curprev 21:1321:13, 2 December 2021DG Regio talk contribs 12,495 bytes +181 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 12,753 bytes +167 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 12,586 bytes −171 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 12,757 bytes +1,565 Created claim: summary (P836): The subject of the project will be the development and armament of the investment areas “Old Tartak” in Barlink, which aim to increase the attractiveness and accessibility of investment zones in the KS area. Material scope: execution of the inner road on the side of ul. The lake and the underground infrastructure: water supply, sanitary and rain drainage, including the construction of the pumping plant and their power supply with electricity, st...
  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 11,192 bytes −1,155 Removed claim: summary (P836): The project will focus on developing and weaponry investment sites for the ‘old sawmill’ in Barlink in order to make investment zones more attractive and accessible in the area covered by the FA. Material scope: implementation of the internal road from the side ul. Lake and underground infrastructure: water supply, sanitary and stormsewerage system including the construction of pumping stations and their injection into electricity, water stora...

24 September 2020

23 June 2020

11 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 09:5909:59, 11 March 2020DG Regio talk contribs 11,066 bytes +1,155 Created claim: summary (P836): The project will focus on developing and weaponry investment sites for the ‘old sawmill’ in Barlink in order to make investment zones more attractive and accessible in the area covered by the FA. Material scope: implementation of the internal road from the side ul. Lake and underground infrastructure: water supply, sanitary and stormsewerage system including the construction of pumping stations and their injection into electricity, water storage...

25 February 2020

18 February 2020

31 January 2020

14 January 2020