Revision history of "Launch of a new generation of steel flanges as a result of the expansion of the “MALMS” plant in Choszno" (Q137409)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 55,788 bytes −3 Changed label, description and/or aliases in pt
  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 55,791 bytes +47 Set a claim value: summary (P836): A implementação do projeto inclui a ampliação e reconstrução do edifício de produção e armazém existente com espaços de produção e a aquisição dos ativos fixos necessários. O projeto prevê a execução das seguintes despesas: 1. Obras de construção para obras de construção 2. Aquisição de ponte rolante – 2 peças. 3. Aquisição de ponte rolante com rotação – 2 peças. 4. Aquisição de câmara de sopro – 1 unidade. 5. Aquisição de filtros – 3 unidades. 6. A...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3220:32, 2 March 2023DG Regio talk contribs 52,570 bytes −78 Changed label, description and/or aliases in it, da, sk, hr, lv, es, fi, fr, ro, ga, nl, el, pt, lt, et, cs, sl, sv, bg, de, hu, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:3900:39, 3 July 2022DG Regio talk contribs 50,525 bytes +30,888 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1021:10, 2 December 2021DG Regio talk contribs 13,167 bytes +1,479 Created claim: summary (P836): La mise en œuvre du projet implique l’extension et la transformation du bâtiment de production et de stockage existant en locaux de production et l’achat des immobilisations nécessaires. Le projet prévoit de mettre en œuvre les dépenses suivantes: 1. Travaux de construction 2. Achat de grue — 2 pièces. 3. Achat de grue aérienne avec plaque tournante — 2 pcs. 4. Achat de chambre de grenaillage — 1 pièce 5. Achat de filtres — 3 pièces. 6. Achat d’...
  • curprev 21:1021:10, 2 December 2021DG Regio talk contribs 11,688 bytes +183 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:3618:36, 21 October 2020DG Regio talk contribs 11,944 bytes +168 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:3618:36, 21 October 2020DG Regio talk contribs 11,776 bytes −192 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:3618:36, 21 October 2020DG Regio talk contribs 11,968 bytes +1,487 Created claim: summary (P836): The implementation of the project includes the expansion and reconstruction of the existing production and warehouse building with production spaces and the purchase of the necessary fixed assets. The project plans to implement the following expenditures: 1. Construction works for construction works 2. Purchase of overhead crane – 2 pcs. 3. Purchase of overhead crane with rotary – 2 pcs. 4. Purchase of blast chamber – 1 pcs. 5. Purchase of filte...
  • curprev 18:3618:36, 21 October 2020DG Regio talk contribs 10,481 bytes −1,016 Removed claim: summary (P836): The implementation of the project involves the extension and reconstruction of the existing building and storage building with a production area and the purchase of the necessary fixed assets. In the framework of the project, the following expenditure is to be realised: 1. Construction work for construction works 2. The purchase of cranes — 2 3. Purchase of a crane with a revolution — 2 4. Purchase of the screw chamber — 1. 5. The purchase of...

24 September 2020

23 June 2020

11 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0110:01, 11 March 2020DG Regio talk contribs 10,207 bytes +1,016 Created claim: summary (P836): The implementation of the project involves the extension and reconstruction of the existing building and storage building with a production area and the purchase of the necessary fixed assets. In the framework of the project, the following expenditure is to be realised: 1. Construction work for construction works 2. The purchase of cranes — 2 3. Purchase of a crane with a revolution — 2 4. Purchase of the screw chamber — 1. 5. The purchase of th...

25 February 2020

18 February 2020

31 January 2020

14 January 2020