Revision history of "Adaptation of architectural and construction premises in kindergarten No. 6 and 12 in Gniezno with land development" (Q137124)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 92,029 bytes +19 Changed label, description and/or aliases in pt
  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 92,010 bytes −29 Set a claim value: summary (P836): O objecto do projecto é a renovação e remodelação de instalações existentes, c. criação de novos lugares em jardins de infância para dz. 3-4 anos de idade:1. Reestruturação e mudança de utilização do edifício do rés-do-chão, situado em ul. Primavera 7 (Pré-escolar n.o 6). Atualmente, o piso térreo é usado como um pom. Há atualmente 4 filiais na pré-escola. Como resultado do projecto, serão criados 1 novos ramos (para 15 crianças). Para a sua criação...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:3220:32, 2 March 2023DG Regio talk contribs 88,865 bytes +218 Changed label, description and/or aliases in lv, it, da, sk, ga, cs, et, mt, bg, fi, es, ro, sv, hr, nl, pt, sl, hu, lt, fr, el, de, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:3300:33, 3 July 2022DG Regio talk contribs 86,521 bytes +56,137 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:4921:49, 2 December 2021DG Regio talk contribs 17,668 bytes +3,229 Created claim: summary (P836): L’objet du projet est la rénovation et une partie de la rénovation des installations existantes, c. la création de nouvelles places dans les jardins d’enfants pour dz. 3-4 ans:1. Reconstruction et changement d’utilisation du rez-de-chaussée, situé à ul. Printemps 7 (Prescolaire no 6). Actuellement, une partie du rez-de-chaussée est utilisée comme résidentiel. Actuellement, il y a 4 branches dans la maternelle. À la suite de ce projet, une nouvel...
  • curprev 21:4921:49, 2 December 2021DG Regio talk contribs 14,439 bytes +176 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:5519:55, 21 October 2020DG Regio talk contribs 14,702 bytes +175 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:5519:55, 21 October 2020DG Regio talk contribs 14,527 bytes −176 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:5519:55, 21 October 2020DG Regio talk contribs 14,703 bytes +2,827 Created claim: summary (P836): The subject of the project is refurbishment and refurbishment of existing facilities, c. creating new places in kindergartens for dz. 3-4 years old:1. Restructure and change of use of the ground floor building, located at ul. Spring 7 (Preschool no. 6). Currently, the ground floor is used as a pom. There are currently 4 branches in the preschool. As a result of the project, 1 new branches (for 15 children) will be created. For its creation, it i...
  • curprev 19:5519:55, 21 October 2020DG Regio talk contribs 11,876 bytes −2,367 Removed claim: summary (P836): The subject of the project is a re-fitting of existing facilities, c. the creation of new places in nursery schools for the Dz. 3-4 years: 1. Transfer and change in use of the ground floor budget, located at ul. Spring 7 (School No 6). Currently part of the ground floor is used as a residential unit. There are currently 4 units in the kindergarten. As a result of the project, there will be 1 new branches (for 15 children). For its creation, it...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2621:26, 10 March 2020DG Regio talk contribs 12,960 bytes +2,367 Created claim: summary (P836): The subject of the project is a re-fitting of existing facilities, c. the creation of new places in nursery schools for the Dz. 3-4 years: 1. Transfer and change in use of the ground floor budget, located at ul. Spring 7 (School No 6). Currently part of the ground floor is used as a residential unit. There are currently 4 units in the kindergarten. As a result of the project, there will be 1 new branches (for 15 children). For its creation, it i...

25 February 2020

18 February 2020

31 January 2020

14 January 2020