Revision history of "Extension and reconstruction of the District Hospital in Nowy Tomyśl – Building “E” II floor, Operational Block and Department of Orthopedics and Traumatology of Traumatology" (Q137022)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 94,651 bytes −15 Changed label, description and/or aliases in pt
  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 94,666 bytes −114 Set a claim value: summary (P836): O objeto do projeto é a reconstrução e conclusão do terceiro andar (II andar) do edifício E hospital para as necessidades do Departamento de Ortopedia e Traumatologia do Órgão do Movimento e da Sala de Ocupação Ortopédica para o PhD Kazimierz Hołoga SPZOZ em Nowy Tomyśl e para a compra de equipamentos médicos e equipamentos desta Divisão de Ortopedia. 1. Obras de construção, incluindo a reconstrução das instalações. 2. Trabalhos de instalação: gases...

12 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:3220:32, 2 March 2023DG Regio talk contribs 91,606 bytes +297 Changed label, description and/or aliases in it, lv, da, sk, et, fi, fr, ga, ro, bg, el, sv, hu, de, cs, sl, es, mt, pt, lt, hr, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:2318:23, 27 July 2022DG Regio talk contribs 89,185 bytes +58,106 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:4821:48, 2 December 2021DG Regio talk contribs 17,930 bytes +3,214 Created claim: summary (P836): L’objet du projet est la reconstruction et la finition du troisième étage (deuxième étage) du bâtiment E-Hospital pour les besoins du département d’orthopédie et de traumatologie de l’organe de mouvement et de la salle d’opération orthopédique pour le doctorat Kazimierz Hołoga SPZOZ à Nowy Tomysl et pour l’achat de matériel médical et d’équipement de ce département d’orthopédie.L’investissement dans la construction comprend: 1. Travaux de constr...
  • curprev 21:4821:48, 2 December 2021DG Regio talk contribs 14,716 bytes +259 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4319:43, 21 October 2020DG Regio talk contribs 14,896 bytes +241 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4319:43, 21 October 2020DG Regio talk contribs 14,655 bytes −234 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4319:43, 21 October 2020DG Regio talk contribs 14,889 bytes +2,838 Created claim: summary (P836): The subject of the project is the reconstruction and completion of the third floor (II floor) of building E hospital for the needs of the Orthopedics and Traumatology Department of the Movement Organ and the orthopaedic Occupying Room for the PhD Kazimierz Hołoga SPZOZ in Nowy Tomyśl and for the purchase of medical equipment and equipment of this Orthopedics Division. 1. Construction works, including reconstruction of the premises. 2. Installati...
  • curprev 19:4319:43, 21 October 2020DG Regio talk contribs 12,051 bytes −2,339 Removed claim: summary (P836): The aim of the project is to rebuild and finish the third floor (II floor) of the hospital Building for the needs of the Department of Ortopedii and Traumatology of the Traffic and Administration Office for the SPZOZ im. Kazimierz Houli in Nowy Tomysl, as well as for the purchase of medical equipment and the equipment of this department of Orléans, the construction project comprises: 1. Construction work, including upgrading of premises. 2. In...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2121:21, 10 March 2020DG Regio talk contribs 13,100 bytes +2,339 Created claim: summary (P836): The aim of the project is to rebuild and finish the third floor (II floor) of the hospital Building for the needs of the Department of Ortopedii and Traumatology of the Traffic and Administration Office for the SPZOZ im. Kazimierz Houli in Nowy Tomysl, as well as for the purchase of medical equipment and the equipment of this department of Orléans, the construction project comprises: 1. Construction work, including upgrading of premises. 2. Inst...

25 February 2020

18 February 2020

31 January 2020

14 January 2020