Revision history of "Key to better education in primary schools in the City of Szamotuły" (Q136622)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 93,576 bytes −2 Changed label, description and/or aliases in pt
  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 93,578 bytes −122 Set a claim value: summary (P836): O projeto será executado de fevereiro de 2019 a agosto de 2021 (31 m) em duas escolas da cidade de Szamotuły: SP nr 1 em Szamotuła e SP nr 2 em Szamotuły wwoj. wlkp O objetivo do projeto é melhorar as condições de ensino. SP 1 e SP 2 em Szamotuły, aumentando a competência. chave. necessária no mercado de trabalho 540u. (283K; 257M), dos quais 200U. (107K;93M) com necessidades educativas especiais. (340U. (200K; 140M) com SP 1 em Szamotuły e 200U. (8...

12 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:3020:30, 2 March 2023DG Regio talk contribs 91,303 bytes +5,007 Changed label, description and/or aliases in it, da, lv, sk, hr, de, fi, fr, et, ro, sv, sl, es, lt, pt, ga, hu, bg, el, cs, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:2200:22, 3 July 2022DG Regio talk contribs 84,172 bytes +53,404 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 20:4220:42, 2 December 2021DG Regio talk contribs 17,672 bytes +3,228 Created claim: summary (P836): Le projet sera mis en œuvre de février 2019 à août 2021 (31 mois) dans deux écoles de la ville de Szamotuły: SP no 1 à Szamotuła et SP no 2 à Szamotuły en voïvodie. L’objectif est d’améliorer les conditions d’enseignement. SP 1 et SP 2 à Szamotuły, soulevant la clé nécessaire sur le marché du travail 540u. (283K;257M) dont 200U. (107K;93M) ayant des besoins spéciaux en matière d’éducation. (340U) (200K;140M) avec SP 1 à Szamotuły et 200U. (83K;1...
  • curprev 20:4220:42, 2 December 2021DG Regio talk contribs 14,444 bytes +148 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0519:05, 21 October 2020DG Regio talk contribs 14,735 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0519:05, 21 October 2020DG Regio talk contribs 14,608 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0519:05, 21 October 2020DG Regio talk contribs 14,735 bytes +2,963 Created claim: summary (P836): The project will be implemented from February 2019 to August 2021 (31 m) in 2 schools in the City of Szamotuły: SP nr 1 in Szamotuła and SP nr 2 in Szamotuły wwoj. wlkp The aim of the project is to improve the teaching conditions. SP 1 and SP 2 in Szamotuły, raising competence. key. necessary on the labour market 540u. (283K; 257M) of which 200U. (107K;93M) with special needs of education. (340U. (200K; 140M) with SP 1 in Szamotuły and 200U. (83...
  • curprev 19:0519:05, 21 October 2020DG Regio talk contribs 11,772 bytes −2,489 Removed claim: summary (P836): The project will run from February 2019 to August 2021 (31 months) in 2 schools in the town of Szamotua: SP No 1 in Szamotuvalves and SP No 2 in Szamot in Wlkp. the objective is to improve the conditions of the dyke. SP 1 and SP 2 in Szamotułines, raising the skills needed in the labour market 540u. (283k; 257M) including 200U. (107k; 93M) with special needs. (340U. (200k; 140M) from SP 1 in Szamovines and 200U. (83k; 117k; m) from SP 2 in Sza...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0710:07, 11 March 2020DG Regio talk contribs 12,978 bytes +2,489 Created claim: summary (P836): The project will run from February 2019 to August 2021 (31 months) in 2 schools in the town of Szamotua: SP No 1 in Szamotuvalves and SP No 2 in Szamot in Wlkp. the objective is to improve the conditions of the dyke. SP 1 and SP 2 in Szamotułines, raising the skills needed in the labour market 540u. (283k; 257M) including 200U. (107k; 93M) with special needs. (340U. (200k; 140M) from SP 1 in Szamovines and 200U. (83k; 117k; m) from SP 2 in Szamo...

25 February 2020

18 February 2020

31 January 2020

14 January 2020