Revision history of "New kindergarten places in the Black Town." (Q136582)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 65,397 bytes +1 Changed label, description and/or aliases in pt
  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 65,396 bytes +44 Set a claim value: summary (P836): O objetivo do projeto é: Aumento do ensino pré-escolar em 23 lugares para crianças (incluindo 13 rapazes e 10 raparigas) com 3 e 4 anos de idade na aldeia de Czarnków de 01.08.2017 para 31.08.2018. O grupo trabalhará 9 horas/dia, 45 horas/semana durante 12 meses do projeto. Para dois grupos pré-escolares criados nas escolas pré-escolares públicas de Śmieszków e Gębicy, o grupo inclui aulas de educação pré-escolar e aulas adicionais «Logopédia com el...

22 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2920:29, 2 March 2023DG Regio talk contribs 62,955 bytes −609 Changed label, description and/or aliases in lv, it, sk, da, fi, sv, de, fr, bg, et, sl, el, pt, ro, cs, ga, hu, hr, es, lt, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:2000:20, 3 July 2022DG Regio talk contribs 61,434 bytes +38,514 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 20:4420:44, 2 December 2021DG Regio talk contribs 14,560 bytes +2,093 Created claim: summary (P836): L’objectif du projet est de: Augmentation de l’enseignement préscolaire de 23 places pour les enfants (dont 13 garçons et 10 filles) âgés de 3 et 4 ans sur le territoire du village de Czarnków du 1er août 2017 au 31 août 2018. Le groupe travaillera 9 heures par jour, 45 heures/semaine pendant 12 mois du projet. Pour les deux groupes préscolaires formés dans les jardins d’enfants publics de Smieków et Gębice, le groupe comprenait des classes d’éd...
  • curprev 20:4420:44, 2 December 2021DG Regio talk contribs 12,467 bytes +123 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0419:04, 21 October 2020DG Regio talk contribs 12,783 bytes +101 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0419:04, 21 October 2020DG Regio talk contribs 12,682 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0419:04, 21 October 2020DG Regio talk contribs 12,794 bytes +1,957 Created claim: summary (P836): The objective of the project is to: Increase in pre-school education by 23 places for children (including 13 boys, 10 girls) aged 3 and 4 in the village of Czarnków from 01.08.2017 to 31.08.2018. The group will work 9 hours/day, 45 h/week for 12 months of the project. For two preschool groups created in the Public Preschools in Śmieszków and Gębicy, the group includes pre-school education classes and additional classes “Logopedia with elements o...
  • curprev 19:0419:04, 21 October 2020DG Regio talk contribs 10,837 bytes −1,480 Removed claim: summary (P836): The aim of the project is to: An increase in the uptake of pre-school education by 23 places for children (including 13 boys, 10 girls) aged 3 and 4 on the soil, Czarnków rural municipality from 01.08.2017 to 31.08.2018, will work 9 h/day, 45godz./tyg for the 12 months of the project. For the two groups in the pre-school groups set up in the public kindergartens, the group provides for pre-school education and the additional activities of “spe...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0610:06, 11 March 2020DG Regio talk contribs 11,043 bytes +1,480 Created claim: summary (P836): The aim of the project is to: An increase in the uptake of pre-school education by 23 places for children (including 13 boys, 10 girls) aged 3 and 4 on the soil, Czarnków rural municipality from 01.08.2017 to 31.08.2018, will work 9 h/day, 45godz./tyg for the 12 months of the project. For the two groups in the pre-school groups set up in the public kindergartens, the group provides for pre-school education and the additional activities of “speec...

25 February 2020

18 February 2020

31 January 2020

14 January 2020