Revision history of "The future begins today" (Q135830)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 71,128 bytes −254 Set a claim value: summary (P836): O futuro começa hoje.O período de execução do projecto: 01.09.2017-31.07.2018 Área de execução do projeto: O principal objetivo do projeto é aceitar ou manter postos de trabalho em, pelo menos, 50 % dos 60UP que cumprem os critérios do Pacto Ecológico, ajustando as qualificações e/ou competências de acordo com as necessidades atuais da República da Polónia em, pelo menos, 76 % dos 60UP que cumprem os critérios do Pacto Ecológico: 60 pessoas (mín. 36...

7 March 2024

15 January 2024

14 June 2023

11 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:0700:07, 3 July 2022DG Regio talk contribs 61,495 bytes +37,505 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 20:4120:41, 2 December 2021DG Regio talk contribs 14,849 bytes +2,238 Created claim: summary (P836): L’avenir commence aujourd’hui.Durée du projet: 01.09.2017-31.07.2018 Domaine de mise en œuvre du projet: L’objectif principal du projet est d’accéder ou de maintenir un emploi pour au moins 50 % des 60 PU répondant aux critères GD, en adaptant les qualifications et/ou les compétences en fonction des besoins actuels de la République de Pologne sur au moins 76 % des 60UP répondant aux critères GD.GD: 60 personnes (minimum 36K) prévues pour licenci...
  • curprev 20:4120:41, 2 December 2021DG Regio talk contribs 12,611 bytes +92 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1618:16, 21 October 2020DG Regio talk contribs 12,962 bytes +84 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1618:16, 21 October 2020DG Regio talk contribs 12,878 bytes −81 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1618:16, 21 October 2020DG Regio talk contribs 12,959 bytes +1,920 Created claim: summary (P836): The future begins today.The period of implementation of the project: 01.09.2017-31.07.2018 Project Implementation Area: Wielkopolska Voivodeship The main objective of the project is to take up or maintain employment by at least 50 % of the 60UPs meeting the GD criteria, by adjusting qualifications and/or competences according to the needs of the current needs of the Polish Republic of Poland among at least 76 % of the 60UP meeting the GD.GD crit...
  • curprev 18:1618:16, 21 October 2020DG Regio talk contribs 11,039 bytes −1,635 Removed claim: summary (P836): The future starts from the project: 01.09.2017-31.07.2018 project area: Wielkopolskie Province the principal objective of the proj is to undertake or maintain employment of at least 50 % of the 60UP fulfilling the GD criteria, by adjusting the qualification and/or competence according to the needs of the current local needs of the Republic of Poland out of at least 76 % of the 60OP meeting the GD.GD: 60oS. (min.36K) intended for exemption and/...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:1021:10, 10 March 2020DG Regio talk contribs 11,383 bytes +1,635 Created claim: summary (P836): The future starts from the project: 01.09.2017-31.07.2018 project area: Wielkopolskie Province the principal objective of the proj is to undertake or maintain employment of at least 50 % of the 60UP fulfilling the GD criteria, by adjusting the qualification and/or competence according to the needs of the current local needs of the Republic of Poland out of at least 76 % of the 60OP meeting the GD.GD: 60oS. (min.36K) intended for exemption and/or...

25 February 2020

18 February 2020

31 January 2020

14 January 2020