Revision history of "Reconstruction by adapting and changing the use of the existing railway station building together with the construction of infrastructure for the Bolechów station" (Q135192)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 75,497 bytes −3 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 75,500 bytes −142 Set a claim value: summary (P836): O projeto consiste numa reconstrução que consiste em adaptar e alterar a utilização do edifício da estação ferroviária existente, juntamente com a construção de infraestruturas para a estação de Bolechów.Como resultado do projeto, parte do edifício reconstruído criará também uma área de serviço moderna, funcional e confortável para os passageiros ferroviários.Nesta zona haverá uma sala de espera para os viajantes, salas em que os passageiros poderão...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2820:28, 2 March 2023DG Regio talk contribs 73,245 bytes +2,067 Changed label, description and/or aliases in it, da, sk, mt, cs, bg, lv, et, lt, fi, pt, de, fr, ro, el, ga, sv, sl, nl, hr, hu, es, and other parts

3 December 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 23:5523:55, 2 July 2022DG Regio talk contribs 69,063 bytes +42,375 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 15,827 bytes +2,299 Created claim: summary (P836): Le projet comprend une reconstruction consistant à adapter et à modifier l’utilisation du bâtiment existant de la gare ainsi que la construction de l’infrastructure de la gare de Bolechów.A la suite de la mise en œuvre du projet, une zone de service ferroviaire moderne, fonctionnelle et confortable pour les voyageurs sera créée dans une partie de l’installation reconstruite. Dans cette zone, il y aura une salle d’attente pour les voyageurs, où l...
  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 13,528 bytes +232 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 13,735 bytes +223 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 13,512 bytes −259 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 13,771 bytes +2,078 Created claim: summary (P836): The project consists of a reconstruction consisting of adapting and changing the use of the existing railway station building together with the construction of infrastructure for the station in Bolechów.As a result of the project, part of the reconstructed building will also create a modern, functional, comfortable area of service for railway passengers.In this zone there will be a waiting room for travellers, rooms in which the passengers will...
  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 11,693 bytes −1,179 Removed claim: summary (P836): The project involves the reconstruction of the conversion and the change of use of the existing railway station building with the construction of the infrastructure for the station in the Bolechori.In the result of the project being carried out in part of the rebuilt plant, a modern, functional, comfortable passenger service area will be created. the project will significantly improve the functionality of the facility for travellers, no waitin...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 09:5409:54, 11 March 2020DG Regio talk contribs 11,582 bytes +1,179 Created claim: summary (P836): The project involves the reconstruction of the conversion and the change of use of the existing railway station building with the construction of the infrastructure for the station in the Bolechori.In the result of the project being carried out in part of the rebuilt plant, a modern, functional, comfortable passenger service area will be created. the project will significantly improve the functionality of the facility for travellers, no waiting...

25 February 2020

18 February 2020

31 January 2020

14 January 2020