Revision history of "“Expansion of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. “People”" (Q135185)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 87,064 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 87,064 bytes −273 Set a claim value: summary (P836): O objecto do projecto é a extensão do sistema rodoviário ul. Sob as Três Pontes em Gniezno, na seção de al. Reymonta para St. Osiniec, que conduz à ZEE e à zona industrial da cidade de Gniezno e, por conseguinte, proporciona a ligação direta necessária com as zonas de investimento existentes. Como parte do projeto, está prevista a reconstrução da estrada existente que liga Al. Reymonta a partir de St. Sunshine aprox. 354 m e construção de uma nova e...

23 March 2024

15 January 2024

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2820:28, 2 March 2023DG Regio talk contribs 84,940 bytes +6,104 Changed label, description and/or aliases in lv, da, it, bg, sk, et, hr, ro, es, lt, pt, hu, fr, nl, sl, ga, sv, el, de, fi, mt, cs, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 23:5523:55, 2 July 2022DG Regio talk contribs 76,708 bytes +48,524 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 16,621 bytes +2,748 Created claim: summary (P836): L’objet du projet est l’extension du réseau routier. Sous trois ponts à Gniezno, sur la section d’al. Reymonta à St. Osiniec, qui conduit à la ZES et à la zone industrielle de la ville de Gniezno, assure ainsi la connexion directe nécessaire aux sites d’investissement existants. Le projet prévoit de reconstruire la route existante reliant Al. Reymonta d’ul. Ensoleillé pour env. 354 m et construction d’une nouvelle route à partir de ul. Ensoleill...
  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 13,873 bytes +173 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 14,139 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 13,955 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 14,115 bytes +2,410 Created claim: summary (P836): The subject of the project is the extension of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. Osiniec, which leads to the SEZ and the industrial area of the City of Gniezno, and therefore provides the necessary direct connection with existing investment areas. As part of the project, it is planned to rebuild the existing road connecting Al. Reymonta from St. Sunshine approx. 354 m and construction...
  • curprev 16:4116:41, 21 October 2020DG Regio talk contribs 11,705 bytes −2,186 Removed claim: summary (P836): The project is the extension of the road layout. Behind in Gniezno, on the section from al. Reymont to ul. Osiiec leading to the SSE and the industrial area of Gniezno and thus providing the necessary direct connection with the existing investment sites. In the framework of the project, it is planned to upgrade the existing road connecting Al. Reymonta, ul. Solar in the region. 354 m and construction of a new road on the section from ul. Solar...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 09:5409:54, 11 March 2020DG Regio talk contribs 12,605 bytes +2,186 Created claim: summary (P836): The project is the extension of the road layout. Behind in Gniezno, on the section from al. Reymont to ul. Osiiec leading to the SSE and the industrial area of Gniezno and thus providing the necessary direct connection with the existing investment sites. In the framework of the project, it is planned to upgrade the existing road connecting Al. Reymonta, ul. Solar in the region. 354 m and construction of a new road on the section from ul. Solar t...

25 February 2020

18 February 2020

31 January 2020

14 January 2020