Revision history of "Construction of the Gostynia ring road within voivodship road No. 434" (Q135169)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 87,510 bytes −5 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 87,515 bytes +25 Set a claim value: summary (P836): O investimento previsto consistirá na construção do circuito. Gostynia dentro de DW 434 e para a secção 6.614 km será implementada na fórmula “Z+B”. Como parte da construção do circuito, será feita uma secção de comprimento. 1,832 km que ligam o circuito ao DW 434 existente em Gostyń – a construção do troço segundo a fórmula «construção». O oblast consiste na construção de estradas com superfície dura e 6,614 km de comprimento, juntamente com instal...

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2820:28, 2 March 2023DG Regio talk contribs 86,595 bytes −1,879 Changed label, description and/or aliases in sk, da, it, sv, lv, fi, sl, cs, ro, de, pt, fr, lt, hr, es, hu, bg, ga, et, el, mt, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:1118:11, 27 July 2022DG Regio talk contribs 86,357 bytes +55,774 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 19:5219:52, 2 December 2021DG Regio talk contribs 17,673 bytes +3,223 Created claim: summary (P836): L’investissement prévu consistera en la construction d’un circuit. Gostynia pendant le DW 434 et pour la section 6,614 km sera réalisé dans la formule «Z+B». Dans le cadre de la construction du circuit, une section longue sera réalisée. 1,832 km reliant le circuit à la piste existante de DW 434 à Gostyń — réalisation du tronçon dans la formule «construction».La route de l’entrepreneur comprend la construction d’une route à surface dure et d’une...
  • curprev 19:5219:52, 2 December 2021DG Regio talk contribs 14,450 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:4016:40, 21 October 2020DG Regio talk contribs 14,752 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4016:40, 21 October 2020DG Regio talk contribs 14,624 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4016:40, 21 October 2020DG Regio talk contribs 14,742 bytes +2,924 Created claim: summary (P836): The planned investment will consist of the construction of the circuit. Gostynia within DW 434 and for the section 6.614 km will be implemented in the formula “Z+B”. As part of the construction of the circuit, a section of length will be made. 1.832 km connecting the circuit to the existing DW 434 in Gostyń – the construction of the section in the “build” formula.The oblast consists of the construction of roads with hard surface and 6.614 km len...
  • curprev 16:4016:40, 21 October 2020DG Regio talk contribs 11,818 bytes −2,513 Removed claim: summary (P836): The planned investment will consist of the construction of a objet. Gostynia within DW 434 and for a 6.614 km section will be made using the ‘Z + B’ formula. In the context of the construction of a ring road will be carried out. 1.832 km binding circuit. with the existing mileage of the DW 434 in Gostyń — implementation of the ‘building’ section of the section consists of construction roads of hard pavement and of a length of 6.614 km, includi...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 09:5409:54, 11 March 2020DG Regio talk contribs 13,041 bytes +2,513 Created claim: summary (P836): The planned investment will consist of the construction of a objet. Gostynia within DW 434 and for a 6.614 km section will be made using the ‘Z + B’ formula. In the context of the construction of a ring road will be carried out. 1.832 km binding circuit. with the existing mileage of the DW 434 in Gostyń — implementation of the ‘building’ section of the section consists of construction roads of hard pavement and of a length of 6.614 km, including...

25 February 2020

18 February 2020

31 January 2020

14 January 2020