Revision history of "Reconstruction of the post-Evangelical church in Odolanów into a multifunctional hall with land development" (Q135129)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 83,544 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 83,544 bytes +295 Set a claim value: summary (P836): O âmbito do projeto inclui a revitalização da igreja pós-evangélica inscrita no registo de monumentos, alterando a sua utilização de objeto religioso para objeto cultural e revitalizando a área de verde urbano que rodeia a antiga igreja. Prevê-se que a sala principal do edifício seja utilizada como sala de concertos, sala de exposições e sala de conferências.O âmbito previsto das obras de construção incluirá:• A construção de ligações de água e esgo...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2820:28, 2 March 2023DG Regio talk contribs 80,076 bytes −50 Changed label, description and/or aliases in da, it, sk, lv, et, hr, fi, es, ga, ro, fr, el, de, mt, lt, hu, sv, pt, cs, sl, nl, bg, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:5423:54, 2 July 2022DG Regio talk contribs 78,019 bytes +49,165 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 19:4419:44, 2 December 2021DG Regio talk contribs 16,913 bytes +2,580 Created claim: summary (P836): Le projet comprend la revitalisation de l’église post-évangélite enregistrée dans le registre des monuments en changeant son utilisation de l’objet religieux à l’objet culturel et en revitalisant la verdure urbaine entourant l’ancienne église. Il est prévu d’utiliser la salle principale du bâtiment comme une salle de concert, une salle d’exposition et une salle de conférence.L’étendue prévue des travaux de construction comprendra:• l’exécution d...
  • curprev 19:4419:44, 2 December 2021DG Regio talk contribs 14,333 bytes +179 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:2416:24, 21 October 2020DG Regio talk contribs 14,593 bytes +168 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2416:24, 21 October 2020DG Regio talk contribs 14,425 bytes −170 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2416:24, 21 October 2020DG Regio talk contribs 14,595 bytes +2,816 Created claim: summary (P836): The scope of the project includes revitalisation of the post-Evangelical church entered in the register of monuments by changing its use from religious to cultural object and revitalising the area of urban green surrounding the former church. It is planned that the main room in the building will be used as a concert hall, exhibition and conference hall.The planned scope of construction works will include:• The construction of water and sewage co...
  • curprev 16:2416:24, 21 October 2020DG Regio talk contribs 11,779 bytes −1,573 Removed claim: summary (P836): The scope of the project consists of the revitalisation of the natural church on historic monuments by changing its pattern of use from religious to a cultural object and the regeneration of an urban green landscape that surrounds the former church. The main room in the building will be used as a concert, exhibition and conference room. Basic parameters of the facility: a one-storey building with an end in an eight-camp, each side from a lengt...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 09:5309:53, 11 March 2020DG Regio talk contribs 12,062 bytes +1,573 Created claim: summary (P836): The scope of the project consists of the revitalisation of the natural church on historic monuments by changing its pattern of use from religious to a cultural object and the regeneration of an urban green landscape that surrounds the former church. The main room in the building will be used as a concert, exhibition and conference room. Basic parameters of the facility: a one-storey building with an end in an eight-camp, each side from a length...

25 February 2020

18 February 2020

31 January 2020

14 January 2020