Revision history of "Construction of sanitary sewage system on the Mąkolno-Sycewo – Sompolno route, which allows exclusion from operation of sewage treatment plant in Mąkolno." (Q135024)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:4018:40, 9 October 2024DG Regio talk contribs 82,689 bytes −10 Changed label, description and/or aliases in pt
  • curprev 18:4018:40, 9 October 2024DG Regio talk contribs 82,699 bytes −864 Set a claim value: summary (P836): O projeto será executado na zona de woj.wlkp.O beneficiário do projeto é a Gm.Sompolno.No âmbito da submedida 4.3.1Gm.Sompolno tenciona realizar um investimento que consiste na construção de uma rede de esgotos de 6429,1 m na rota Mąkolno-Sycewo-Sycewo. O objetivo específico da submedida é o aumento da percentagem da população que utiliza o sistema de tratamento de águas residuais. O âmbito do projeto inclui: canalização sanitária com um comprimento...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 80,389 bytes +14,233 Changed label, description and/or aliases in da, it, sk, es, lt, cs, sv, bg, de, ga, fi, hr, lv, el, nl, pt, ro, et, sl, fr, hu, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:5123:51, 2 July 2022DG Regio talk contribs 64,055 bytes +34,807 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:0221:02, 2 December 2021DG Regio talk contribs 16,479 bytes +2,982 Created claim: summary (P836): Le projet sera mis en œuvre dans la voïvodie.Le bénéficiaire du projet est Gm.Sompolno.Dans le cadre de la sous-mesure 4.3.1Gm.Sompolno prévoit de mettre en œuvre un investissement consistant en la construction de 6 429,1 m de réseau d’assainissement sanitaire sur la route Mąkolno-Sycewo-Sompolno, permettant l’exclusion du nettoyage.Les eaux usées à Mąkolno.L’agglomération de Sompolno est établie à Gm.Sompolno.Equivalente la population est de 4 ...
  • curprev 21:0221:02, 2 December 2021DG Regio talk contribs 13,497 bytes +242 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1916:19, 21 October 2020DG Regio talk contribs 13,694 bytes +218 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1916:19, 21 October 2020DG Regio talk contribs 13,476 bytes −253 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1916:19, 21 October 2020DG Regio talk contribs 13,729 bytes +1,694 Created claim: summary (P836): The project will be implemented in the area of woj.wlkp.The beneficiary of the project is Gm.Sompolno.As part of sub-measure 4.3.1Gm.Sompolno plans to carry out an investment consisting of the construction of 6429.1 m sewage network on the Mąkolno-Sycewo-Sycewo route. The specific purpose of the sub-measure is the increased proportion of the population using the sewage treatment system.The scope of the project includes: sanitary canalisation wit...
  • curprev 16:1916:19, 21 October 2020DG Regio talk contribs 12,035 bytes −1,705 Removed claim: summary (P836): The project will be carried out in the wake of the project. the beneficiary project is Gm.Sommn.o.In the context of the sub-measure 4.3.1Gm.Sompolno, it plans to realise the investment of 6 429.1 m of a sewerage network on the Mąko/Sycevo-Sompono route, which makes it possible to exclude waste water from waste water in Mąkolni.In the Gm.Sompolno agglomeration is formed of Sompono.Equivalent of the inhabitants for the aglom.Sompolno. the extent...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 09:5209:52, 11 March 2020DG Regio talk contribs 12,455 bytes +1,705 Created claim: summary (P836): The project will be carried out in the wake of the project. the beneficiary project is Gm.Sommn.o.In the context of the sub-measure 4.3.1Gm.Sompolno, it plans to realise the investment of 6 429.1 m of a sewerage network on the Mąko/Sycevo-Sompono route, which makes it possible to exclude waste water from waste water in Mąkolni.In the Gm.Sompolno agglomeration is formed of Sompono.Equivalent of the inhabitants for the aglom.Sompolno. the extent o...

25 February 2020

18 February 2020

31 January 2020

14 January 2020