Revision history of "Interchange node Owińska" (Q134955)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:4018:40, 9 October 2024DG Regio talk contribs 64,626 bytes −2 Changed label, description and/or aliases in pt
  • curprev 18:4018:40, 9 October 2024DG Regio talk contribs 64,628 bytes −289 Set a claim value: summary (P836): Tarefa 1. Modernização do parque de estacionamento PAMP;R e BAMP;R, juntamente com os equipamentos e infraestruturas de acompanhamento necessários para lidar com os viajantes, bem como reconstrução de ruas e cruzamento de vias férreas. Aquisição de autocarros com baixo nível de emissões para o transporte de passageiros para a ZWP.Tarefa 3. Medidas de promoção da informação para incentivar a utilização de formas de mobilidade hipocarbónicas, transpor...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 21:1821:18, 2 March 2023DG Regio talk contribs 62,520 bytes +4,120 Changed label, description and/or aliases in it, da, sk, fi, fr, hr, lv, ga, sv, pt, el, lt, ro, et, hu, de, bg, sl, es, cs, nl, mt, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 18:0918:09, 27 July 2022DG Regio talk contribs 56,285 bytes +33,938 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0721:07, 2 December 2021DG Regio talk contribs 14,231 bytes +2,069 Created claim: summary (P836): Activité 1. Modernisation du Pamp;R et Bamp;R parking avec les installations et l’infrastructure nécessaires pour s’occuper des voyageurs et reconstruire les rues et traverser les voies ferrées.Tâche 2. Achat d’autobus à faibles émissions pour le transport de passagers vers ZWP.Tâche 3. Les mesures de promotion de l’information visant à encourager l’utilisation de la mobilité à faible intensité de carbone, des transports publics en commun, du vé...
  • curprev 21:0721:07, 2 December 2021DG Regio talk contribs 12,162 bytes +86 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:2018:20, 21 October 2020DG Regio talk contribs 12,515 bytes +84 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:2018:20, 21 October 2020DG Regio talk contribs 12,431 bytes −83 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:2018:20, 21 October 2020DG Regio talk contribs 12,514 bytes +1,646 Created claim: summary (P836): Task 1. Modernisation of the parking lot PAMP;R and BAMP;R together with accompanying equipment and infrastructure necessary to handle travellers, as well as reconstruction of streets and crossing railway tracks. Purchase of low-emission buses for transporting passengers to ZWP.Task 3. Information-promotion measures to encourage the use of low-carbon forms of mobility, public public transport, bicycles or pedestrians.Its material effects (produc...
  • curprev 18:2018:20, 21 October 2020DG Regio talk contribs 10,868 bytes −1,254 Removed claim: summary (P836): Target 1. Modernisation of the PPamp park; r and Bamp; r together with the associated facilities and necessary infrastructure for the handling of passengers and the reconstruction of the streets and the crossing of railways.Task 2. Purchase of low carbon buses for transporting passengers to ZWP.Zadanie 3. Information and publicity measures to encourage the use of low-emission mobility, public transport, cycling or walking in kind (products) ar...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2521:25, 10 March 2020DG Regio talk contribs 10,831 bytes +1,254 Created claim: summary (P836): Target 1. Modernisation of the PPamp park; r and Bamp; r together with the associated facilities and necessary infrastructure for the handling of passengers and the reconstruction of the streets and the crossing of railways.Task 2. Purchase of low carbon buses for transporting passengers to ZWP.Zadanie 3. Information and publicity measures to encourage the use of low-emission mobility, public transport, cycling or walking in kind (products) are:...

25 February 2020

18 February 2020

31 January 2020

14 January 2020