Revision history of "Construction of integrated interchange nodes with accompanying infrastructure in Śrem." (Q134938)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 86,645 bytes +36,486 Changed label, description and/or aliases in da, it, sk, fi, bg, fr, et, lv, de, cs, pt, ro, ga, sl, es, sv, hu, el, mt, lt, nl, hr, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4923:49, 2 July 2022DG Regio talk contribs 48,049 bytes +19,979 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 15,537 bytes +3,085 Created claim: summary (P836): Le projet suppose l’exécution de 3 tâches: 1) Construction d’un hub intégré avec infrastructure d’accompagnement dans la partie de la rive droite de Śrem à ul.Stary Rynek-parking Pamp;R(130 places de stationnement[MP], dont 7 pour la zone de la zone, Bamp;R-42 MP, route d’accès (430 m), piste cyclable (410 m), baie d’autobus, nouvel éclairage(113 lampes), drainage, petite architecture(benches-30 pcs,tables-5 pcs), système de comptage des places...
  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 12,452 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 12,750 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 12,604 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 12,747 bytes +892 Created claim: summary (P836): X-6-2-73-4-20-28-270"(6)(2-73)(2-73)(2-73)(2-73)(4-20)(28-270 x-4)(2-73), translated_summary
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 11,855 bytes −877 Removed claim: summary (P836): Pro.assumes 3 tasks: (1) Construction of an integrated interchange with an associated infrastructure in the right part of the average at the lower end of the park; r-42 MP, an access road (113 m), a bicycle path (410 m), demolition of an existing surface, land use, road installation, road site, road and road signage; print posters (300.), demolition of terrain, road and road markings; ‘Bikeamp; ride’ -2 unit., ‘Bikeamp; ride’ -130 unit of buil...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2521:25, 10 March 2020DG Regio talk contribs 11,454 bytes +877 Created claim: summary (P836): Pro.assumes 3 tasks: (1) Construction of an integrated interchange with an associated infrastructure in the right part of the average at the lower end of the park; r-42 MP, an access road (113 m), a bicycle path (410 m), demolition of an existing surface, land use, road installation, road site, road and road signage; print posters (300.), demolition of terrain, road and road markings; ‘Bikeamp; ride’ -2 unit., ‘Bikeamp; ride’ -130 unit of built...

25 February 2020

18 February 2020

31 January 2020

14 January 2020