Revision history of "Correction of the functioning of the communication system in the Rataje roundabout area" (Q134936)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4205:42, 10 October 2024DG Regio talk contribs 91,635 bytes +11 Changed label, description and/or aliases in pt
  • curprev 05:4205:42, 10 October 2024DG Regio talk contribs 91,624 bytes +9 Set a claim value: summary (P836): O projeto inclui a parte da infraestrutura que consiste na construção de um nó de intercâmbio integrado (ZWP) – 1 unidade e na aquisição de um novo material circulante para autocarros – 15 unidades. A parte da infraestrutura inclui a reconstrução da infraestrutura da via e da rede com a sua adaptação ao tráfego de autocarros na via (o comprimento total das linhas novas ou reconstruídas é de cerca de 1,605 km) e a correspondente correção do sistema r...

20 March 2024

15 January 2024

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 89,218 bytes −878 Changed label, description and/or aliases in lv, it, da, sk, el, sv, et, fi, bg, ro, cs, fr, ga, hr, nl, lt, sl, pt, hu, mt, de, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 18:0918:09, 27 July 2022DG Regio talk contribs 87,984 bytes +57,561 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 17,520 bytes +3,152 Created claim: summary (P836): Le projet couvre la partie infrastructure consistant en la construction d’un hub intégré (ZWP) — 1 pièce et l’achat de nouveau matériel roulant d’autobus — 15 PC. La partie infrastructure consiste, entre autres, la reconstruction de la voie et de l’infrastructure de réseau avec son adaptation pour l’exploitation du trafic d’autobus sur la voie (la longueur totale des lignes neuves ou reconstruites est d’environ. 1,605 km) et la correction corres...
  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 14,368 bytes +140 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 14,667 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 14,521 bytes −146 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 14,667 bytes +2,845 Created claim: summary (P836): The project includes the infrastructure part consisting of the construction of an integrated interchange node (ZWP) – 1 pcs and the purchase of a new bus rolling stock – 15 units The infrastructure part includes reconstruction of track and network infrastructure with its adaptation for bus traffic on the track (the total length of new or reconstructed lines is approx. 1.605 km) and related correction of the road system, including paths for bicyc...
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 11,822 bytes −2,226 Removed claim: summary (P836): The project comprises an infrastructure part consisting of the construction of an integrated interchange hub (ZWP) of 1 tonnes and the purchase of new bus rolling stock — 15 units. 1.605 km) and the related adjustment of the road system, including paths for bicycles (long length of built and upgraded cycle roads are about. 2.892 km), Bamir’s car parks; r (1 out of 25 posts) and the installation of ITS (1 units) and the designation of the bus l...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2521:25, 10 March 2020DG Regio talk contribs 12,763 bytes +2,226 Created claim: summary (P836): The project comprises an infrastructure part consisting of the construction of an integrated interchange hub (ZWP) of 1 tonnes and the purchase of new bus rolling stock — 15 units. 1.605 km) and the related adjustment of the road system, including paths for bicycles (long length of built and upgraded cycle roads are about. 2.892 km), Bamir’s car parks; r (1 out of 25 posts) and the installation of ITS (1 units) and the designation of the bus lan...

25 February 2020

18 February 2020

31 January 2020

14 January 2020