Revision history of "Construction of the Integrated Interchange Node Murowana Goślina." (Q134934)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 92,542 bytes −2,304 Changed label, description and/or aliases in da, it, sk, lv, hu, ga, pt, fi, sv, et, ro, mt, sl, cs, de, hr, bg, lt, es, fr, el, nl, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4923:49, 2 July 2022DG Regio talk contribs 92,729 bytes +62,010 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 17,949 bytes +3,148 Created claim: summary (P836): La mise en œuvre du projet s’effectuera dans le cadre des deux volets suivants: 1)Construction d’un hub de raccordement intégré [ZWP] à la gare ferroviaire de Murowana Goślino[MG]-11.05.2016-25.05.2018 — construction d’un parking P&R à ul.Kolejowa en MG (y compris 37MP pour les véhicules, dont 3 pour perp.,1 MP pour les véhicules à microbus, 100 MP pour les vélos-174 m² en descente, routes de manœuvre et 3 chaussées en béton de 8 cm en béton bit...
  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 14,801 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 15,120 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 14,995 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 15,111 bytes +3,317 Created claim: summary (P836): Implementation of the project will be carried out within the framework of 2 a.m.: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/m...
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 11,794 bytes −1,729 Removed claim: summary (P836): The pro.s will be carried out as part of the 2th EAP: 1) Construction of an integrated hub [ZWP] at a railway station in Murowana Goślina [MG] -11.05.2016-25.05.2018 — construction of a car park P & R at ul.Railways in MG (m.in.37MP for carcass., of which 3 MP for microbus type, 1 MP for type-100m174s, and the construction of a new outlet and a 2mb cube, from ul. Gruszyńsko -3mb), construction of a car park area of 8 cm concrete, unroad.9.ligh...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2521:25, 10 March 2020DG Regio talk contribs 12,242 bytes +1,729 Created claim: summary (P836): The pro.s will be carried out as part of the 2th EAP: 1) Construction of an integrated hub [ZWP] at a railway station in Murowana Goślina [MG] -11.05.2016-25.05.2018 — construction of a car park P & R at ul.Railways in MG (m.in.37MP for carcass., of which 3 MP for microbus type, 1 MP for type-100m174s, and the construction of a new outlet and a 2mb cube, from ul. Gruszyńsko -3mb), construction of a car park area of 8 cm concrete, unroad.9.lights...

25 February 2020

18 February 2020

31 January 2020

14 January 2020