Revision history of "Supporting low-carbon strategies in the City and Municipality of Szamotuły through the construction of the Integrated Interchange Node in Szamotuła, Memorial and Baborik together with infrastructure." (Q134929)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 97,613 bytes −13 Changed label, description and/or aliases in pt
  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 97,626 bytes +1,322 Set a claim value: summary (P836): X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,41...

22 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 93,907 bytes −22,669 Changed label, description and/or aliases in lv, it, da, sk, lt, ro, sl, pt, fi, sv, de, hr, fr, et, hu, bg, el, mt, nl, cs, es, ga, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4923:49, 2 July 2022DG Regio talk contribs 114,452 bytes +82,009 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 19,301 bytes +2,944 Created claim: summary (P836): Proj.realizo. fera partie de 5 tâches et comprendra la construction de 3 nœuds de transfert intégrés (ZWP) à partir de infrastrukturą:1.Budowa ZWP à Szamotuła (travaux de préparation et de démolition, surfaces de la zone frontalière, bus de la baie, wafer, dr.manewr.-1 056 m², parking Pamp;R(83msc dont 2pour p.m. partiel-1 047,5 m²), Bamp;R(60msc), reconstruction du réseau d’assainissement pluie.,entrées, routes cyclables.-500 m², trottoirs-674 ...
  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 16,357 bytes +302 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 16,494 bytes +261 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 16,233 bytes −267 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 16,500 bytes +4,403 Created claim: summary (P836): X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,2...
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 12,097 bytes −2,624 Removed claim: summary (P836): Proj.realizo. will be part of five tasks and will include. construction of 3 integrated interchanges (ZWP) with infrastructure: 1. Construction of the ZWP in Szamotuły (preparation and demolition works, surfaces made of granite, bus bay, clamps, dr-maneuver-1056m2, Pamp car parks; R (83msc in including 2 for disabled - 1047,5m2), Bamp; R (60msc), reconstruction of the rainwater sewage system, entrances, bicycle paths - 500m2, walkways - 674 m2...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 07:5107:51, 11 March 2020Wildmax talk contribs 13,431 bytes +2,624 Created claim: summary (P836): Proj.realizo. will be part of five tasks and will include. construction of 3 integrated interchanges (ZWP) with infrastructure: 1. Construction of the ZWP in Szamotuły (preparation and demolition works, surfaces made of granite, bus bay, clamps, dr-maneuver-1056m2, Pamp car parks; R (83msc in including 2 for disabled - 1047,5m2), Bamp; R (60msc), reconstruction of the rainwater sewage system, entrances, bicycle paths - 500m2, walkways - 674 m2,...

25 February 2020

18 February 2020

31 January 2020

14 January 2020