Revision history of "Poznań Metropolitan Railway. Integration nodes – construction of a system of functional interchange points. Construction of an integrated interchange node and extension of the interchange node Oborniki Miasto." (Q134921)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 89,303 bytes −24 Changed label, description and/or aliases in pt
  • curprev 18:4718:47, 8 October 2024DG Regio talk contribs 89,327 bytes −1,115 Set a claim value: summary (P836): O projeto tem por objeto a construção do(s) parque(s) de estacionamento público e a extensão do nó integrado em Oborniki. Incluirá as seguintes intenções:- construção de 2 parkamp;rides («parque e passeio»), num total de min.148 lugares de estacionamento (incluindo 7 para pessoas com deficiência), iluminados com lâmpadas LED e equipados com pequenos elementos arquitetónicos (cestos, beijos) e espaço verde organizado na zona. A execução da tarefa mel...

7 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 16:3416:34, 2 March 2023DG Regio talk contribs 88,045 bytes +20,861 Changed label, description and/or aliases in lv, da, fr, ro, it, sk, bg, hr, et, sl, de, lt, ga, fi, nl, sv, el, es, hu, mt, pt, cs, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4923:49, 2 July 2022DG Regio talk contribs 65,059 bytes +35,978 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 16,348 bytes +2,801 Created claim: summary (P836): L’objet du projet est la construction d’un hub intégré à Wargow et l’extension de la jonction intégrée à Oborniki.Le projet comprend les objectifs suivants:- la construction de 2 parkamp;ride objets («park and ride»), y compris min.148 places de stationnement (dont 7 pour les personnes handicapées), éclairés par des lampes LED et équipés d’éléments de petite architecture (paniers, bancs, panneaux d’information) et de verdure organisée dans la zo...
  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 13,547 bytes +286 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 13,700 bytes +272 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 13,428 bytes −274 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 13,702 bytes +1,656 Created claim: summary (P836): The object of the project is the construction of the public parking lot(s) and the extension of the integrated node in Oborniki.It will include the following intentions:- construction of 2 parkamp;rides (“park and drive”), totaling min.148 parking places (including 7 for disabled persons), lit with LED lamps and equipped with small architectural elements (baskets, kissboards) and organised green space in the area. Implementation of the task will...
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 12,046 bytes −1,322 Removed claim: summary (P836): The project involves the construction of an integrated interchange hub in the Wargo and the development of an integrated junction in the Oborników: the Undertaking covers the following objectives: — the construction of 2 parkamp plants; ride (‘park and ride’), comprising 148 km of parking spaces (including 7 for persons with disabilities), parking facilities for bicycles with a total length of 2.601 km, the construction of a bikeamp bus parkin...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2521:25, 10 March 2020DG Regio talk contribs 12,077 bytes +1,322 Created claim: summary (P836): The project involves the construction of an integrated interchange hub in the Wargo and the development of an integrated junction in the Oborników: the Undertaking covers the following objectives: — the construction of 2 parkamp plants; ride (‘park and ride’), comprising 148 km of parking spaces (including 7 for persons with disabilities), parking facilities for bicycles with a total length of 2.601 km, the construction of a bikeamp bus parking...

25 February 2020

18 February 2020

31 January 2020

14 January 2020