Revision history of "Construction of an integrated interchange point in Jumping" (Q134920)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 86,921 bytes +2,714 Changed label, description and/or aliases in lv, it, da, sk, es, cs, ga, fi, ro, hu, et, lt, fr, sv, hr, nl, pt, bg, mt, de, el, sl, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 18:0918:09, 27 July 2022DG Regio talk contribs 82,089 bytes +52,714 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 17,166 bytes +3,047 Created claim: summary (P836): La mise en œuvre de ce projet s’effectuera dans le cadre de deux tâches: 1)Construction d’une jonction intégrée à la gare de Skokach — réalisation.08.04.2016-31.12.2017 Il créera un nœud de changement et une route d’accès reconstruite ainsi que l’infrastructure accompagnant la jonction.Sur la zone de la jonction de transfert sera créée: stationnement, passages à pied et allées, trottoirs et autres durcissements, abris pour vélos et poubelles, ve...
  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 14,119 bytes +118 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 14,440 bytes +117 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 14,323 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 14,438 bytes +2,646 Created claim: summary (P836): The implementation of this project will be carried out within 2 tasks: 1)Construction of an integrated interchange junction at the railway station in Skoki – realiz.08.04.2016-31.12.2017 The interchange node and the reconstructed access road together with the infrastructure accompanying the junction will be created. parking, walking and roadways, pavements and other hardenings, bicycle and garbage shelters, greenery, parking lighting, small arch...
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 11,792 bytes −2,143 Removed claim: summary (P836): The implementation of this project will be carried out in the framework of 2 tasks: 1) Construction of an integrated connecting hub at the Skoka railway station — implementing.08.04.2016-31.12.2017 To be set up by the connecting hub and the reconstructed access road along with the associated infrastructure at the connecting hub. parking, driveways, pavements and other paving, cycling and credence, green, parking lighting, small architecture: c...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2521:25, 10 March 2020DG Regio talk contribs 12,644 bytes +2,143 Created claim: summary (P836): The implementation of this project will be carried out in the framework of 2 tasks: 1) Construction of an integrated connecting hub at the Skoka railway station — implementing.08.04.2016-31.12.2017 To be set up by the connecting hub and the reconstructed access road along with the associated infrastructure at the connecting hub. parking, driveways, pavements and other paving, cycling and credence, green, parking lighting, small architecture: con...

25 February 2020

18 February 2020

31 January 2020

14 January 2020