Revision history of "Metropolitan Cycling Route System in the commune of Czerwonak and Murowana Goślina" (Q134916)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3418:34, 9 October 2024DG Regio talk contribs 84,245 bytes −18 Changed label, description and/or aliases in pt
  • curprev 18:3418:34, 9 October 2024DG Regio talk contribs 84,263 bytes −1,148 Set a claim value: summary (P836): O projeto prevê a realização de 5 tarefas no período 07.01.2019-30.11.2020:zad.1 abrangendo obras de conceção e construção: o caminho recreativo de 1,515 km de comprimento em Owińska, um caminho para bicicletas com um comprimento de 2,309 km em Bolechów com elementos de luminescência, poço, esgotos, drenagem e drenagem da chuva, iluminação, 3 parques de estacionamento de BAMP; R com pequena arquitetura e locais de descanso, infraestruturas implement...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 84,515 bytes +20,718 Changed label, description and/or aliases in lv, da, sk, it, cs, es, ga, fi, ro, et, lt, hr, sv, fr, nl, bg, pt, de, mt, sl, el, hu, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4923:49, 2 July 2022DG Regio talk contribs 61,683 bytes +33,146 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 16,292 bytes +3,072 Created claim: summary (P836): Le projet implique la mise en œuvre de 5 tâches au cours de la période 07.01.2019-30.11.2020:zad.1 couvrant les travaux de conception et de construction: une piste cyclable d’une longueur de 1,515 km à Owińska, une piste cyclable de 2,309 km à Bolechów avec des éléments luminescents, des puits, des égouts, des drains de pluie, des éclairages, 3 aires de stationnement pour les marécages;R avec de petites architectures et des lieux de repos, des i...
  • curprev 21:0421:04, 2 December 2021DG Regio talk contribs 13,220 bytes +191 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 13,468 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 13,326 bytes −164 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 13,490 bytes +1,640 Created claim: summary (P836): The project envisages carrying out 5 tasks in the period 07.01.2019-30.11.2020:zad.1 covering design and construction works: the recreational path of the length of 1,515 km in Owińska, a bicycle path with a length of 2.309 km in Bolechów with elements of luminescent, well, sewage, drainage and rain drainage, lighting, 3 parking lots of BAMP;R with small architecture and places of rest, infrastructure implemented by the road improving the safety...
  • curprev 18:1918:19, 21 October 2020DG Regio talk contribs 11,850 bytes −2,005 Removed claim: summary (P836): The project assumes 5 tasks for the period 07.01.2019-30.11.2020: 1 covering design works and construction: the cycle path for the cycle of 1.515 km in Owińska, a cycle path of 2.309 km in Boleów and rainwater, lights, drains and drains, lighting, 3 Bambp; r with a small architecture and locators, infrastructure improving traffic safety, facilities for disabled persons, markings on horizontal and powered-lift equipment. (3) Information and pro...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2421:24, 10 March 2020DG Regio talk contribs 12,578 bytes +2,005 Created claim: summary (P836): The project assumes 5 tasks for the period 07.01.2019-30.11.2020: 1 covering design works and construction: the cycle path for the cycle of 1.515 km in Owińska, a cycle path of 2.309 km in Boleów and rainwater, lights, drains and drains, lighting, 3 Bambp; r with a small architecture and locators, infrastructure improving traffic safety, facilities for disabled persons, markings on horizontal and powered-lift equipment. (3) Information and promo...

25 February 2020

18 February 2020

31 January 2020

14 January 2020