Revision history of "Construction of the Gołanice, Jezierzyce Kościelne, Włoszakowice line and the organisation of transfer points in the area of Leszczyński County as part of the task of reducing low emissions in the Leszczyńska Agglomeration" (Q134896)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4205:42, 10 October 2024DG Regio talk contribs 90,985 bytes −29 Changed label, description and/or aliases in pt
  • curprev 05:4205:42, 10 October 2024DG Regio talk contribs 91,014 bytes −19 Set a claim value: summary (P836): O projeto tem por objeto a construção de 9,953 km de uma linha de bicicletas a pé no troço Gołanice-Jezierzyce Kościelne-Krzyżowiec-Włoszakowice, juntamente com a organização de 8 locais de transferência localizados em Święciechów, Gołanice, Jezierzyce Kościelnych, Tearow, Włoszakowice, Boszków-Letnisko, Pawłowice, Oporów, na estação ferroviária de Leszno. Iluminação energeticamente eficiente até 40 kW será instalada em 6 pontos de transferência. No...

7 March 2024

15 January 2024

6 July 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 88,636 bytes +1,913 Changed label, description and/or aliases in ga, lv, da, it, bg, sk, fi, ro, es, hr, pt, el, lt, de, hu, fr, sv, cs, et, nl, sl, mt, and other parts

3 December 2022

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4823:48, 2 July 2022DG Regio talk contribs 83,398 bytes +53,891 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 20:3920:39, 2 December 2021DG Regio talk contribs 17,397 bytes +2,857 Created claim: summary (P836): Le projet a pour objet la construction d’un parcours pédestre et cyclable de 9 953 km sur le tronçon Gołanice-Jezierzyce Kościelne-Krzyżowiec-Włoszakowice, ainsi que l’organisation de 8 lieux de transfert situés à Święciechów, Gołanice, Jezierzyce Kościelne, Teutonic Knights, Włoszakowice, Boszków-Letnisk, Pawłowice, Oporów, et à la gare de Leszno. Un éclairage économe en énergie pouvant atteindre 40 kW sera installé dans 6 lieux de transfert. D...
  • curprev 20:3920:39, 2 December 2021DG Regio talk contribs 14,540 bytes +298 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 14,681 bytes +287 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 14,394 bytes −324 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 14,718 bytes +2,634 Created claim: summary (P836): The object of the project is the construction of 9.953 km of walking-bike line on the Gołanice-Jezierzyce Kościelne-Krzyżowiec-Włoszakowice section, together with the organisation of 8 transfer places located in Święciechów, Gołanice, Jezierzyce Kościelnych, Tearow, Włoszakowice, Boszków-Letnisko, Pawłowice, Oporów, at the railway station in Leszno. Energy-efficient lighting up to 40 kW will be installed in 6 interchange points. As part of the p...
  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 12,084 bytes −2,183 Removed claim: summary (P836): The project involves the construction of 9.953 km of pedestrians and cyclists on the section of Golanica-Jezierka Kościelniece-Krzyżeczeczeczowice with the organisation of the 8 connecting points located in Święciechowo, Gołice, Jezierzyce Kościelne, on Krzyżowu, in Italians, Boszkoe-Letniko, Pawłowice, Oporwie, Oporów, in Leszno station, will be set to a bicycle stand. Energy efficient lighting up to 40 kW will be installed at 6 connecting po...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2421:24, 10 March 2020DG Regio talk contribs 12,991 bytes +2,183 Created claim: summary (P836): The project involves the construction of 9.953 km of pedestrians and cyclists on the section of Golanica-Jezierka Kościelniece-Krzyżeczeczeczowice with the organisation of the 8 connecting points located in Święciechowo, Gołice, Jezierzyce Kościelne, on Krzyżowu, in Italians, Boszkoe-Letniko, Pawłowice, Oporwie, Oporów, in Leszno station, will be set to a bicycle stand. Energy efficient lighting up to 40 kW will be installed at 6 connecting poin...

25 February 2020

18 February 2020

31 January 2020

14 January 2020