Revision history of "Interchange centres with the necessary infrastructure" (Q134887)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 91,032 bytes −2 Changed label, description and/or aliases in pt
  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 91,034 bytes +82 Set a claim value: summary (P836): A principal tarefa do projeto será a criação de:1. Centro de intercâmbio na estação ferroviária. Inclui o parque de estacionamento P&R, que permite o estacionamento de 83 automóveis (3 lugares para pessoas com deficiência), equipado com componentes de sistemas de transporte inteligentes para a contagem de veículos (utilização de 2 circuitos de indução e 2 painéis de informação), o infokiosk, que permite aos passageiros familiarizarem-se com os horár...

22 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 88,555 bytes +138 Changed label, description and/or aliases in it, da, sk, cs, de, ro, fi, bg, el, lv, ga, pt, fr, sv, es, sl, lt, hu, mt, et, hr, nl, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4823:48, 2 July 2022DG Regio talk contribs 86,300 bytes +56,721 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 20:3920:39, 2 December 2021DG Regio talk contribs 17,364 bytes +3,037 Created claim: summary (P836): La tâche principale du projet sera de créer:1. Le centre de transfert de la gare. Il comprend un parking P&R, qui permet le stationnement de 83 voitures (3 places pour les personnes handicapées), équipé de systèmes de transport intelligents pour le comptage des véhicules (utilisation de 2 boucles inductives et 2 cartes d’information), infokiosk permettant aux passagers de se familiariser avec l’horaire actuel, le schéma du réseau, ainsi que des...
  • curprev 20:3920:39, 2 December 2021DG Regio talk contribs 14,327 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 14,646 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 14,534 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 14,642 bytes +2,866 Created claim: summary (P836): The main task of the project will be the creation of:1. Interchange centre at the railway station. It includes the P&R car park, which allows parking of 83 cars (3 seats for people with disabilities), equipped with Intelligent Transport Systems components for counting vehicles (use of 2 induction loops and 2 information boards), infokiosk allowing passengers to familiarise themselves with the current timetables, the network scheme, as well as im...
  • curprev 18:1818:18, 21 October 2020DG Regio talk contribs 11,776 bytes −2,399 Removed claim: summary (P836): The main task of the project will be the creation of 1. Transfer centre at PKP station. It includes a car park of the type P & R, which allows parking 83 aut (3 places for disabled persons), equipped with the components of Intelligent Transport Systems for the purpose of rolling out vehicles (use of 2 induction loops and 2 signboards), a helpline allowing passengers to familiarise themselves with the current timetable, the grid scheme, and the...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2421:24, 10 March 2020DG Regio talk contribs 12,883 bytes +2,399 Created claim: summary (P836): The main task of the project will be the creation of 1. Transfer centre at PKP station. It includes a car park of the type P & R, which allows parking 83 aut (3 places for disabled persons), equipped with the components of Intelligent Transport Systems for the purpose of rolling out vehicles (use of 2 induction loops and 2 signboards), a helpline allowing passengers to familiarise themselves with the current timetable, the grid scheme, and the i...

25 February 2020

18 February 2020

31 January 2020

14 January 2020