Revision history of "Comprehensive energy modernisation of public utility buildings in Mosina Municipality – stage I" (Q134842)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:4016:40, 10 October 2024DG Regio talk contribs 90,876 bytes +13 Changed label, description and/or aliases in pt
  • curprev 16:4016:40, 10 October 2024DG Regio talk contribs 90,863 bytes −186 Set a claim value: summary (P836): O projeto será executado no âmbito das 2 apm-1.Termomodernização do edifício de utilidade pública (composto por 4 segmentos) utilizado para efeitos da escola primária n.o 1 e do pavilhão desportivo OSiR e 2.Promoção do projeto. O projeto será executado no período de 29.9.2017 a 31.8.2018. Txxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx3xxxxxxxxxxxxxxxxxxxxxxx(045)(25xxxxxxxxxxx...

20 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 88,652 bytes −14,438 Changed label, description and/or aliases in fr, ro, lv, da, it, et, lt, sk, de, cs, sv, bg, es, hr, fi, hu, sl, pt, ga, nl, el, mt, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 18:0818:08, 27 July 2022DG Regio talk contribs 100,975 bytes +70,391 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 20:3620:36, 2 December 2021DG Regio talk contribs 17,779 bytes +3,221 Created claim: summary (P836): Le projet sera mis en œuvre dans le cadre de la 2e partie-1.Termomodernisation du bâtiment d’utilité publique (composé de 4 segments) utilisé pour les besoins de l’école primaire no 1 et de la salle de sport OSiR et 2.Promotion. Le projet sera mis en œuvre entre le 29 septembre 2017 et le 31 août 2018. Le champ d’application des travaux de thermomodernisation prévus comprend: 1) Le réchauffement de 661,06 m² de murs extérieurs historiques (bâtim...
  • curprev 20:3620:36, 2 December 2021DG Regio talk contribs 14,558 bytes +164 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:0818:08, 21 October 2020DG Regio talk contribs 14,833 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:0818:08, 21 October 2020DG Regio talk contribs 14,677 bytes −153 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:0818:08, 21 October 2020DG Regio talk contribs 14,830 bytes +2,965 Created claim: summary (P836): The project will be implemented within the framework of 2 apm-1.Termomodernisation of the public utility building (consisting of 4 segments) used for the purposes of primary school no.1 and sports hall OSiR and 2.Promotion of project. The project will be implemented in the period from 29.09.2017 to 31.08.2018. Txxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx3xxxxxxxxxxxxxxxx...
  • curprev 18:0818:08, 21 October 2020DG Regio talk contribs 11,865 bytes −1,097 Removed claim: summary (P836): Implementation of the project will be carried out as part of the 2-1.Thermomodernisation of the public utility (comprising 4 segments) used for Primary School No 1 and the OSiR sports hall and 2.Promotion. Pro.will be implemented in the period 29.09.2017-31.08.2018. The scope of the intended thermal modernisation works consists of (1) the warming of 661.06 m² of historic external walls (Building B) with mineral wool sheets with a conductivity...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:0821:08, 10 March 2020DG Regio talk contribs 11,678 bytes +1,097 Created claim: summary (P836): Implementation of the project will be carried out as part of the 2-1.Thermomodernisation of the public utility (comprising 4 segments) used for Primary School No 1 and the OSiR sports hall and 2.Promotion. Pro.will be implemented in the period 29.09.2017-31.08.2018. The scope of the intended thermal modernisation works consists of (1) the warming of 661.06 m² of historic external walls (Building B) with mineral wool sheets with a conductivity fa...

25 February 2020

18 February 2020

31 January 2020

14 January 2020