Revision history of "Thermomodernisation of the church The Assumption of the Lord in Wolsztyn" (Q134804)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:4016:40, 10 October 2024DG Regio talk contribs 73,116 bytes −4 Changed label, description and/or aliases in pt
  • curprev 16:4016:40, 10 October 2024DG Regio talk contribs 73,120 bytes −187 Set a claim value: summary (P836): O tema do projeto é a termomodernização da igreja. A Ascensão do Senhor em Wolsztyn foi determinada com base na auditoria energética e na documentação técnica, incluindo:1) modernização do sistema de aquecimento com ar quente com base no aquecedor com queimador de gás e sistema de condutas de ar – 1 kpl., na seguinte gama• substituição da caldeira de carvão com baixa eficiência para o sistema de aquecimento com queimador de gás,• remoção de tubos e...

22 March 2024

15 January 2024

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 18:4518:45, 2 March 2023DG Regio talk contribs 70,910 bytes +2,697 Changed label, description and/or aliases in lv, it, da, sk, fi, et, ga, es, ro, de, hu, sv, bg, cs, pt, mt, sl, nl, lt, hr, el, fr, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 18:0818:08, 27 July 2022DG Regio talk contribs 66,103 bytes +41,076 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 20:4020:40, 2 December 2021DG Regio talk contribs 15,376 bytes +2,433 Created claim: summary (P836): Le sujet du projet est la thermomodernisation de l’église. L’Ascension du Seigneur à Wolsztyn a déterminé sur la base de l’audit énergétique et de la documentation technique, y compris: 1) la modernisation du système de chauffage pour le chauffage à l’air chaud sur la base d’un chauffage avec un brûleur à gaz et des conduits d’air — 1 kpl., dans le cadre suivant • le remplacement d’une chaudière à charbon à faible rendement par un brûleur à gaz,...
  • curprev 20:4020:40, 2 December 2021DG Regio talk contribs 12,943 bytes +131 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:0718:07, 21 October 2020DG Regio talk contribs 13,251 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:0718:07, 21 October 2020DG Regio talk contribs 13,120 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:0718:07, 21 October 2020DG Regio talk contribs 13,243 bytes +2,027 Created claim: summary (P836): The subject of the project is the thermomodernisation of the church. The Ascension of the Lord in Wolsztyn determined on the basis of energy audit and technical documentation, including:1) modernisation of heating system for heating with warm air on the basis of heater with gas burner and air duct system – 1 kpl., in the following range• replacement of coal boiler with low efficiency for heating system with gas burner,• removal of pipes and radi...
  • curprev 18:0718:07, 21 October 2020DG Regio talk contribs 11,216 bytes −1,605 Removed claim: summary (P836): The project is a thermo-modernisation of the Church of the Church. Ascension Day, defined on the basis of an energy audit and technical documentation, comprising: (1) modernisation of the heating system for hot air heating based on a gas burner and air channel system — 1 kpl., to replace the boiler with a low efficiency on a gas burner,• removing pipes for the heating system and radiators;• Assembly of a system of ducts that distribute air to...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:0721:07, 10 March 2020DG Regio talk contribs 11,531 bytes +1,605 Created claim: summary (P836): The project is a thermo-modernisation of the Church of the Church. Ascension Day, defined on the basis of an energy audit and technical documentation, comprising: (1) modernisation of the heating system for hot air heating based on a gas burner and air channel system — 1 kpl., to replace the boiler with a low efficiency on a gas burner,• removing pipes for the heating system and radiators;• Assembly of a system of ducts that distribute air to a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020