Revision history of "Comprehensive energy modernisation of the School Complex building in Ptaszkowo" (Q134780)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2506:25, 9 October 2024DG Regio talk contribs 85,855 bytes −4 Changed label, description and/or aliases in pt
  • curprev 06:2506:25, 9 October 2024DG Regio talk contribs 85,859 bytes −708 Set a claim value: summary (P836): O tema do projeto é a modernização térmica abrangente do edifício Zesp. Escolas em Ptaszków, que abriga a escola primária e a escola secundária. Número total de beneficiários directos aprox. 270 pessoas.O edifício foi construído em 1992. Como parte da tarefa, está prevista a seguinte gama de obras: isolamento das paredes com styrop. de espessura de 13 cm (lambda 0,04 W/mK), isolamento de styrop. de espessura de 14 cm, aquecimento dos tectos da parte...

22 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 21:0321:03, 2 March 2023DG Regio talk contribs 84,170 bytes +12,615 Changed label, description and/or aliases in it, da, lv, sk, et, hr, fi, ro, fr, sv, pt, lt, sl, hu, de, el, ga, nl, es, mt, bg, cs, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4623:46, 2 July 2022DG Regio talk contribs 69,448 bytes +41,900 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 20:3720:37, 2 December 2021DG Regio talk contribs 16,330 bytes +2,775 Created claim: summary (P836): Le sujet du projet est la thermomodernisation complète du bâtiment zesp. Écoles d’oiseaux, qui abrite l’école primaire et le gymnase. Nombre total de destinataires directs env. 270 personnes.Le bâtiment a été construit en 1992. A ce jour, aucun travail de thermomodernisation n’a été réalisé.Dans le cadre de la tâche, la gamme suivante est prévue: les murs sont prévus en styrophage. d’une épaisseur de 13 cm (lambda 0,04 W/mK), le réchauffement de...
  • curprev 20:3720:37, 2 December 2021DG Regio talk contribs 13,555 bytes +134 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:0618:06, 21 October 2020DG Regio talk contribs 13,860 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:0618:06, 21 October 2020DG Regio talk contribs 13,723 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:0618:06, 21 October 2020DG Regio talk contribs 13,858 bytes +2,124 Created claim: summary (P836): The subject of the project is comprehensive thermal modernisation of the Zesp building. Schools in Ptaszków, which houses primary school and junior high school. Total number of direct recipients approx. 270 people.The building was built in 1992. As part of the task, the following range of works are planned: insulation of the walls with styrop. of thickness of 13 cm (lambda 0.04 W/mK), insulation of styrop. of thickness of 14 cm, warming of the c...
  • curprev 18:0618:06, 21 October 2020DG Regio talk contribs 11,734 bytes −1,334 Removed claim: summary (P836): The project consists of a comprehensive thermal renovation of the Zesp Building. Schools in the Ptaszkowo, where the Primary School and the Gimnatum School is located. Total direct recipients ca. 270 of the Building was built in 1992. No thermal modernisation works have been carried out to date. 84, replacement of intermediate pipes: 84, replacement of tubular metal filament lamps with a plastic liner or with a metal/LED-glass frame — units 25...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:0721:07, 10 March 2020DG Regio talk contribs 11,786 bytes +1,334 Created claim: summary (P836): The project consists of a comprehensive thermal renovation of the Zesp Building. Schools in the Ptaszkowo, where the Primary School and the Gimnatum School is located. Total direct recipients ca. 270 of the Building was built in 1992. No thermal modernisation works have been carried out to date. 84, replacement of intermediate pipes: 84, replacement of tubular metal filament lamps with a plastic liner or with a metal/LED-glass frame — units 252,...

25 February 2020

18 February 2020

31 January 2020

14 January 2020