7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 93,050 bytes −4 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 93,054 bytes −8 Set a claim value: summary (P836): O projeto previsto consiste na construção de uma central eólica composta por duas turbinas eólicas ST1 e ST3, com uma capacidade de 2 MW cada (4 MW no total), com uma altura máxima até 160 m acima do nível do mar, juntamente com os elementos que as acompanham (linha elétrica SN, cabos de controlo e equipamento elétrico necessário). Os parques eólicos fazem parte das fontes de energia renováveis. O processo de produção não utiliza qualquer tipo de co...

20 March 2024

15 January 2024

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2720:27, 2 March 2023DG Regio talk contribs 90,665 bytes +909 Changed label, description and/or aliases in fr, it, ro, lv, da, el, fi, sk, es, et, cs, pt, ga, lt, hu, sl, sv, hr, mt, de, bg, nl, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4523:45, 2 July 2022DG Regio talk contribs 87,640 bytes +57,024 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 20:1620:16, 2 December 2021DG Regio talk contribs 17,747 bytes +3,205 Created claim: summary (P836): Le projet envisagé consiste en la construction d’un parc éolien composé de deux éoliennes ST1 et ST3 d’une capacité de 2 MW chacune (4 MW combinés) avec une hauteur maximale de 160 m au-dessus du niveau de la mer, ainsi que des éléments d’accompagnement (ligne d’alimentation SN, câbles de commande et équipements électriques nécessaires). Les centrales éoliennes sont incluses en tant que sources d’énergie renouvelables. Le processus de production...
  • curprev 20:1620:16, 2 December 2021DG Regio talk contribs 14,542 bytes +246 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:5917:59, 21 October 2020DG Regio talk contribs 14,735 bytes +217 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5917:59, 21 October 2020DG Regio talk contribs 14,518 bytes −217 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5917:59, 21 October 2020DG Regio talk contribs 14,735 bytes +2,728 Created claim: summary (P836): The planned project consists of the construction of a wind power plant consisting of two ST1 and ST3 wind turbines with a capacity of 2 MW each (4 MW in total) with a maximum height of up to 160 m above sea level, together with accompanying elements (SN power line, control cables and necessary power equipment). Wind farms are part of renewable energy sources. The production process does not use any kind of fuel, only wind energy. The main elemen...
  • curprev 17:5917:59, 21 October 2020DG Regio talk contribs 12,007 bytes −2,242 Removed claim: summary (P836): The planned project consists of the construction of a wind power plant consisting of two wind turbines ST1 and ST3, with a capacity of 2 MW each (4 MW combined), with a maximum height of 160 m., including the accompanying elements (SN line, electric control cables and the necessary power units). Wind power plants are one of renewable energy sources. No fuel, only wind energy, is used in the production process. The basic components of the insta...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:0321:03, 10 March 2020DG Regio talk contribs 12,966 bytes +2,242 Created claim: summary (P836): The planned project consists of the construction of a wind power plant consisting of two wind turbines ST1 and ST3, with a capacity of 2 MW each (4 MW combined), with a maximum height of 160 m., including the accompanying elements (SN line, electric control cables and the necessary power units). Wind power plants are one of renewable energy sources. No fuel, only wind energy, is used in the production process. The basic components of the install...