Revision history of "“profile” energy-efficient and more competitive" (Q134693)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1604:16, 11 October 2024DG Regio talk contribs 91,881 bytes +486 Set a claim value: summary (P836): O objetivo do projeto é melhorar a eficiência energética da empresa e, assim, melhorar a sua competitividade. O investimento previsto inclui: 1. Termomodernização da parte escritório-social do edifício de produção, incluindo:- aquecimento das paredes utilizando o método de isopor sem juntas BSO com uma espessura de 12 cm;- isolamento de poliestireno com uma espessura de 20 cm;- substituição da marcenaria de janelas e portas. 2. Modernização do proce...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

27 July 2022

  • curprev 18:0718:07, 27 July 2022DG Regio talk contribs 95,457 bytes +66,565 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 20:1420:14, 2 December 2021DG Regio talk contribs 17,515 bytes +2,954 Created claim: summary (P836): L’objectif du projet est d’améliorer l’efficacité énergétique de l’entreprise et donc d’améliorer sa compétitivité. La portée de l’investissement prévu comprend: 1. Thermomodernisation du bureau et des parties sociales du bâtiment de production, y compris:- l’isolation des murs par méthode sans couture BSO avec du polystyrène de 12 cm d’épaisseur;- 20 cm d’épaisseur pour le réchauffement du styropode;- le remplacement de la menuiserie des fenêtr...
  • curprev 20:1420:14, 2 December 2021DG Regio talk contribs 14,561 bytes +111 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:5717:57, 21 October 2020DG Regio talk contribs 14,889 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5717:57, 21 October 2020DG Regio talk contribs 14,779 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5717:57, 21 October 2020DG Regio talk contribs 14,889 bytes +3,131 Created claim: summary (P836): The aim of the project is to improve the energy efficiency of the company and thus improve its competitiveness. The planned investment includes:1. Thermomodernisation of the office-social part of the production building, including:- Warming of the walls using BSO jointless method of styrofoam with a thickness of 12 cm;- polystyrene insulation with a thickness of 20 cm;- replacement of window and door joinery. 2. Modernisation of the process thro...
  • curprev 17:5717:57, 21 October 2020DG Regio talk contribs 11,758 bytes −2,139 Removed claim: summary (P836): The project aims at improving the energy efficiency of the company and thereby improving its competitiveness. The planned investment includes: 1. Thermal modernisation of the office and social part of the building building, including: — insulation walls of BSO styropine with a thickness of 12 cm; — insulation of a 20 cm thickness of the bypass; — replacement of window and door frames. 2. Modernisation of the technological process through the p...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:0221:02, 10 March 2020DG Regio talk contribs 12,614 bytes +2,139 Created claim: summary (P836): The project aims at improving the energy efficiency of the company and thereby improving its competitiveness. The planned investment includes: 1. Thermal modernisation of the office and social part of the building building, including: — insulation walls of BSO styropine with a thickness of 12 cm; — insulation of a 20 cm thickness of the bypass; — replacement of window and door frames. 2. Modernisation of the technological process through the pur...

25 February 2020

18 February 2020

31 January 2020

14 January 2020