Revision history of "Increase the level of competitiveness of the company Intelligent Training through the purchase and implementation of innovative solutions to prevent metabolic diseases and ageing of the human body within the framework of the Intelligent Training Academy." (Q134612)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1604:16, 11 October 2024DG Regio talk contribs 98,348 bytes −4 Changed label, description and/or aliases in pt
  • curprev 04:1604:16, 11 October 2024DG Regio talk contribs 98,352 bytes +5 Set a claim value: summary (P836): A implementação deste projeto pela Formação Inteligente incluirá a aquisição de equipamento de treino inovador que criará circuitos de força, circuitos de força e vibrações, bem como software de gestão de treino periférico, que são necessários para implementar inovações de produto utilizadas à escala global por um período não superior a 5 anos.Graças a todo o âmbito do projeto, será possível: — a prestação de formação inteligente no domínio da preve...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2620:26, 2 March 2023DG Regio talk contribs 94,036 bytes +929 Changed label, description and/or aliases in it, fr, lv, sv, da, ro, de, cs, sk, hr, fi, es, bg, el, et, sl, hu, lt, pt, mt, nl, ga, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:4223:42, 2 July 2022DG Regio talk contribs 89,375 bytes +58,142 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 20:0220:02, 2 December 2021DG Regio talk contribs 18,003 bytes +3,140 Created claim: summary (P836): La mise en œuvre de ce projet par la société Smart Training comprendra l’achat d’appareils de formation innovants qui créeront un circuit de force-force, un circuit de force et un circuit vibrant ainsi que des logiciels de gestion de la formation périphérique, qui sont nécessaires à la mise en œuvre d’innovations de produits appliquées dans le monde entier dans l’entreprise au plus tard 5 ans. Grâce à la mise en œuvre de l’ensemble du projet, il...
  • curprev 20:0220:02, 2 December 2021DG Regio talk contribs 14,863 bytes +325 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:5317:53, 21 October 2020DG Regio talk contribs 14,977 bytes +314 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5317:53, 21 October 2020DG Regio talk contribs 14,663 bytes −290 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5317:53, 21 October 2020DG Regio talk contribs 14,953 bytes +2,756 Created claim: summary (P836): Implementation of this project by Intelligent Training will include the purchase of innovative training equipment that will create strength-strength circuit, strength circuit, and vibration as well as peripheral training management software, which are necessary to implement product innovations used on a global scale for no longer than 5 years.Thanks to the full scope of the project, it will be possible to: — the provision of intelligent training...
  • curprev 17:5317:53, 21 October 2020DG Regio talk contribs 12,197 bytes −2,425 Removed claim: summary (P836): The implementation of this project by the Smart Trening company will consist of the purchase of innovative training devices that will form the strength of the strength, force and vibration periphery as well as the software for the management of peripheral training devices that are necessary for the implementation of the product innovations that are used worldwide for no longer than 5 years. by carrying out the full project, the full scope of t...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:5120:51, 10 March 2020DG Regio talk contribs 13,335 bytes +2,425 Created claim: summary (P836): The implementation of this project by the Smart Trening company will consist of the purchase of innovative training devices that will form the strength of the strength, force and vibration periphery as well as the software for the management of peripheral training devices that are necessary for the implementation of the product innovations that are used worldwide for no longer than 5 years. by carrying out the full project, the full scope of the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020