Revision history of "Strengthening the competitiveness of the company “TARTAK Powidz JACEK DRYGAŁA” through the application of innovation and investment" (Q134325)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 84,912 bytes −17 Changed label, description and/or aliases in pt
  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 84,929 bytes −183 Set a claim value: summary (P836): O projeto será executado no período de 14.12.2016 a 30.1.2018 Tendo em conta a relação de investimento/benefícios para o desenvolvimento de Jacek Drygały, o projeto foi adotado para apoiar o investimento em:- obras de construção: secagem e sala de caldeiras,- aquisição de ativos fixos: sala de caldeiras, secador – 2 peças, placas, empilhadeira, carregadora telescópica, linha de ligação de elementos de madeira ao comprimento.O investimento será utili...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2620:26, 2 March 2023DG Regio talk contribs 81,939 bytes +1,436 Changed label, description and/or aliases in lv, da, it, sk, ro, fr, fi, sv, hr, et, ga, sl, lt, de, hu, pt, bg, nl, es, mt, cs, el, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 18:0418:04, 27 July 2022DG Regio talk contribs 78,387 bytes +50,129 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 16,755 bytes +2,774 Created claim: summary (P836): Le projet sera réalisé du 14.12.2016 au 30.01.2018 Compte tenu de la relation entre les dépenses/avantages pour le développement de la société Jacka Drygała, le soutien à l’investissement pour:- travaux de construction: séchage et chaufferie,- achat d’actifs fixes: chaufferie, sécheuse — 2 pièces, raboteur, chariot élévateur, chargeuse télescopique, ligne pour relier les éléments en bois à la longueur. L’investissement sera utilisé pour commence...
  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 13,981 bytes +212 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:0317:03, 21 October 2020DG Regio talk contribs 14,208 bytes +196 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0317:03, 21 October 2020DG Regio talk contribs 14,012 bytes −179 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0317:03, 21 October 2020DG Regio talk contribs 14,191 bytes +2,390 Created claim: summary (P836): The project will be implemented in the period from 14.12.2016 to 30.01.2018 Taking into account the investment relationship/benefits for the development of Jacek Drygały, the project was adopted to support investment on:- construction works: drying and boiler room,- purchase of fixed assets: boiler room, dryer – 2 pcs, planers, forklift truck, telescopic loader, line for joining wooden elements to length.The investment will be used to launch the...
  • curprev 17:0317:03, 21 October 2020DG Regio talk contribs 11,801 bytes −1,848 Removed claim: summary (P836): The project will be implemented between 14.12.2016 and 30.01.2018. dryers and boiler rooms, — purchase of fixed assets: boiler, drying rooms — 2 units, strings, fork-lift trucks, shovel loaders, wooden loaders, the investment line will serve to mobilise the production of speciality pallets for liquid transport in the flexible tanks so called FLUID-BAGA, while using a piece of low-quality wood, by producing an engineering semi-finished seat to...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:3621:36, 10 March 2020DG Regio talk contribs 12,372 bytes +1,848 Created claim: summary (P836): The project will be implemented between 14.12.2016 and 30.01.2018. dryers and boiler rooms, — purchase of fixed assets: boiler, drying rooms — 2 units, strings, fork-lift trucks, shovel loaders, wooden loaders, the investment line will serve to mobilise the production of speciality pallets for liquid transport in the flexible tanks so called FLUID-BAGA, while using a piece of low-quality wood, by producing an engineering semi-finished seat to th...

25 February 2020

18 February 2020

31 January 2020

14 January 2020