Revision history of "Strengthening the potential of PLASTWIL Sp. z o.o. through the implementation of R & D works on the SBW3 rail attachment system." (Q134065)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2506:25, 9 October 2024DG Regio talk contribs 78,467 bytes −10 Changed label, description and/or aliases in pt
  • curprev 06:2506:25, 9 October 2024DG Regio talk contribs 78,477 bytes −354 Set a claim value: summary (P836): O projeto diz respeito à PLASTWIL que realiza trabalhos de I & D para desenvolver a inovação de produtos – um sistema de ligação ferroviária melhorado SBW3 O projeto será executado no período de 1.5.2019-31.5.2021. A fim de adquirir novos conhecimentos em investigação industrial (Fase 1), serão realizados estudos sobre a conceção e o desenvolvimento de um novo conceito de pormenores: Kotwa SB, inserto isolante e revestimento PWE. As estruturas desen...

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2520:25, 2 March 2023DG Regio talk contribs 77,171 bytes +8,159 Changed label, description and/or aliases in it, da, sk, lv, ga, fi, et, es, hr, sl, ro, cs, sv, de, el, fr, lt, nl, bg, pt, hu, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:3023:30, 2 July 2022DG Regio talk contribs 66,893 bytes +41,125 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 19:3319:33, 2 December 2021DG Regio talk contribs 15,990 bytes +2,353 Created claim: summary (P836): Le projet concerne la mise en œuvre des travaux de R & D de PLASTWIL afin de développer une innovation produit — un système amélioré de fixation des rails de type SBW3 Le projet sera réalisé dans la période 01.05.2019-31.05.2021.Afin d’acquérir de nouvelles connaissances dans le cadre de la recherche industrielle (phase 1), la recherche sera menée dans le domaine de la conception et du développement d’un nouveau concept de détails: SB Anchor, in...
  • curprev 19:3319:33, 2 December 2021DG Regio talk contribs 13,637 bytes +192 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:0716:07, 21 October 2020DG Regio talk contribs 13,884 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0716:07, 21 October 2020DG Regio talk contribs 13,696 bytes −196 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0716:07, 21 October 2020DG Regio talk contribs 13,892 bytes +1,948 Created claim: summary (P836): The project concerns PLASTWIL carrying out R & D work to develop product innovation – an improved rail attachment system SBW3 The project will be implemented in the period 01.05.2019-31.05.2021.In order to acquire new knowledge in industrial research (Stage 1), studies will be carried out on design and development of a new concept of details: Kotwa SB, insulating insulating insert and PWE liner. The developed structures will be analysed by MES.A...
  • curprev 16:0716:07, 21 October 2020DG Regio talk contribs 11,944 bytes −1,773 Removed claim: summary (P836): The project concerns the development of R & D by the company PLASTWIL for the development of product innovation, a refined SBW3 rail fastening system. the project will be implemented in the period 01.05.2019-31.05.2021. in order to acquire new knowledge within the framework of industrial research (Step 1), studies will be carried out on the design and development of a new concept for the details of: the tube of SB, the electro-insulating liner...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:0121:01, 10 March 2020DG Regio talk contribs 12,440 bytes +1,773 Created claim: summary (P836): The project concerns the development of R & D by the company PLASTWIL for the development of product innovation, a refined SBW3 rail fastening system. the project will be implemented in the period 01.05.2019-31.05.2021. in order to acquire new knowledge within the framework of industrial research (Step 1), studies will be carried out on the design and development of a new concept for the details of: the tube of SB, the electro-insulating liner o...

25 February 2020

18 February 2020

31 January 2020

14 January 2020