Revision history of "The construction and equipment of infrastructures to develop and implement innovative release testing methods for the preclinical evaluation of the biopharmaceutical properties of generic forms." (Q134040)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 20:2520:25, 2 March 2023DG Regio talk contribs 91,846 bytes +527 Changed label, description and/or aliases in lv, it, da, sk, ga, de, cs, et, mt, fi, bg, es, ro, sv, hr, sl, pt, nl, fr, hu, lt, el, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:2923:29, 2 July 2022DG Regio talk contribs 89,194 bytes +58,463 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 20:1420:14, 2 December 2021DG Regio talk contribs 17,757 bytes +3,129 Created claim: summary (P836): Le projet comprend la construction d’une infrastructure de recherche — un laboratoire pharmaceutique avec salles auxiliaires, d’une surface totale utilisable de 147,40 m². Sur la base des technologies de l’information et de la communication, des équipements scientifiques et des services connexes, qui seront utilisés par la communauté scientifique pour mener des recherches sur la libération de substances médicinales provenant de différentes forme...
  • curprev 20:1420:14, 2 December 2021DG Regio talk contribs 14,628 bytes +294 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5215:52, 21 October 2020DG Regio talk contribs 14,773 bytes +254 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5215:52, 21 October 2020DG Regio talk contribs 14,519 bytes −259 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5215:52, 21 October 2020DG Regio talk contribs 14,778 bytes +2,755 Created claim: summary (P836): The project involves the construction of research infrastructure – pharmaceutical laboratory with auxiliary rooms, with a total usable area of 147.40 m². Based on information and communication technologies, scientific equipment and related services, which will be used by the scientific community to conduct research on the release of medicinal substances from different forms of medicines. Construction shall include: general construction works, in...
  • curprev 15:5215:52, 21 October 2020DG Regio talk contribs 12,023 bytes −2,223 Removed claim: summary (P836): The project involves the construction of a research infrastructure — a pharmaceutical laboratory, together with auxiliary rooms, with a total useful floor area of 147.40 m². ICT-based, scientific equipment and related services that will be used by the scientific community to conduct research into the release of medicinal substances from different forms of medicine. The construction shall consist of: general construction works, installation wor...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:0021:00, 10 March 2020DG Regio talk contribs 12,956 bytes +2,223 Created claim: summary (P836): The project involves the construction of a research infrastructure — a pharmaceutical laboratory, together with auxiliary rooms, with a total useful floor area of 147.40 m². ICT-based, scientific equipment and related services that will be used by the scientific community to conduct research into the release of medicinal substances from different forms of medicine. The construction shall consist of: general construction works, installation works...

25 February 2020

18 February 2020

31 January 2020

14 January 2020