Revision history of "Social Integration Club 2017-2019" (Q133620)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3216:32, 10 October 2024DG Regio talk contribs 89,000 bytes −9 Set a claim value: summary (P836): O objetivo do projeto é aumentar a participação social e profissional de 36 residentes do município de Kętrzyn ameaçados de exclusão social e seus arredores através da participação na reintegração social e profissional no Clube de Integração Social do GOPS em Kętrzyn no período de março de 2017 a dezembro de 2019. A execução do projeto implica a obtenção de eficiência em termos de emprego a um nível de, pelo menos, 22 % – 8 participantes e de socioe...

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

2 July 2022

  • curprev 23:2223:22, 2 July 2022DG Regio talk contribs 84,097 bytes +54,678 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:2812:28, 2 December 2021DG Regio talk contribs 17,243 bytes +3,112 Created claim: summary (P836): L’objectif du projet est d’accroître l’activité sociale et professionnelle de 36 habitants de la commune de Kętrzyn exposés au risque d’exclusion sociale et de leur environnement en participant à la réinsertion socioprofessionnelle au Club d’intégration sociale du GOPS de Kętrzyn entre mars 2017 et décembre 2019. La mise en œuvre du projet suppose la réalisation d’une efficacité en matière d’emploi d’au moins 22 % — 8 participants, et d’un nivea...
  • curprev 12:2812:28, 2 December 2021DG Regio talk contribs 14,131 bytes +98 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:3118:31, 21 October 2020DG Regio talk contribs 14,472 bytes +92 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:3118:31, 21 October 2020DG Regio talk contribs 14,380 bytes −92 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:3118:31, 21 October 2020DG Regio talk contribs 14,472 bytes +2,785 Created claim: summary (P836): The aim of the project is to increase social and professional participation in 36 residents of the Kętrzyn commune threatened with social exclusion and their surroundings through participation in social and professional reintegration in the Club of Social Integration at GOPS in Kętrzyn in the period from March 2017 to December 2019. Implementation of the project involves achieving employment efficiency at the level of at least 22 % – 8 participa...
  • curprev 18:3118:31, 21 October 2020DG Regio talk contribs 11,687 bytes −2,316 Removed claim: summary (P836): The aim of the project is to increase the social and professional activity of the 36 inhabitants of Kętrzyn at risk of social exclusion and their surroundings by contributing to the social and occupational reintegration in the Social Inclusion Club of GOPs in Kêtrzyn from March 2017 to December 2019. The implementation of the project involves achieving an employment efficiency of at least 22 % to 8 participants, a social employment contract of...

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3920:39, 10 March 2020DG Regio talk contribs 12,718 bytes +2,316 Created claim: summary (P836): The aim of the project is to increase the social and professional activity of the 36 inhabitants of Kętrzyn at risk of social exclusion and their surroundings by contributing to the social and occupational reintegration in the Social Inclusion Club of GOPs in Kêtrzyn from March 2017 to December 2019. The implementation of the project involves achieving an employment efficiency of at least 22 % to 8 participants, a social employment contract of a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020