Revision history of "Overcome barriers with Pig Social Inclusion Club" (Q133350)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2406:24, 9 October 2024DG Regio talk contribs 91,317 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:2406:24, 9 October 2024DG Regio talk contribs 91,318 bytes −161 Set a claim value: summary (P836): O principal objetivo do projeto é a reintegração social de 40 pessoas em risco de eclodir do município de Pisz para o fundo. 31.7.2019 através do financiamento de medidas de ativação nos NEI. O objetivo principal será prosseguido através dos objetivos específicos do projeto: — integração social de 40 UP até 31.7.2019 — integração profissional de 40 UP até 31.7.2019 — integração educativa de 40 UP em 31.7.2019 — integração sanitária de 40 UP até 31.7...

23 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2420:24, 2 March 2023DG Regio talk contribs 88,721 bytes +3,826 Changed label, description and/or aliases in lv, da, it, sk, cs, pt, et, ga, fi, el, ro, sl, sv, hr, lt, de, mt, hu, nl, es, bg, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 17:5517:55, 27 July 2022DG Regio talk contribs 83,214 bytes +53,113 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:1712:17, 2 December 2021DG Regio talk contribs 18,031 bytes +3,045 Created claim: summary (P836): L’objectif principal du projet est la réinsertion sociale de 40 personnes à risque de maltage du territoire de la municipalité de Pisz à dn. 31.07.2019 par le financement de mesures d’activation dans KIS. L’objectif principal sera poursuivi à travers les objectifs spécifiques du projet: — intégration sociale 40 UP d’ici le 31.07.2019 — Intégration professionnelle 40 UP d’ici le 31 juillet 2019 — Intégration éducative 40 UP au 31 juillet 2019 — I...
  • curprev 12:1712:17, 2 December 2021DG Regio talk contribs 14,986 bytes +126 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:4017:40, 21 October 2020DG Regio talk contribs 15,299 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4017:40, 21 October 2020DG Regio talk contribs 15,192 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4017:40, 21 October 2020DG Regio talk contribs 15,306 bytes +2,656 Created claim: summary (P836): The main objective of the project is the social reintegration of 40 people at risk of hatching from the municipality of Pisz to the bottom. 31.07.2019 through the financing of activation measures in the NIS. The main objective will be pursued through the specific objectives of the project: — social integration of 40 UP until 31.07.2019 – professional integration of 40 UP until 31.07.2019 – Educational integration 40 UP on 31.07.2019 – Health int...
  • curprev 17:4017:40, 21 October 2020DG Regio talk contribs 12,650 bytes −2,348 Removed claim: summary (P836): The main aim of the project is to reintegrate 40 people at risk from the territory of the municipality of Pisz to the end of the day. 31.07.2019 by funding activation measures in the KIS. The main objective will be pursued through the specific objectives of the project: — Social integration 40 UP to dn 31.07.2019 — vocational integration 40 UP to 31.07.2019 dn 31.07.2019 — educational integration 40 UP by 40 — educational integration 31.07.201...

15 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:2520:25, 10 March 2020DG Regio talk contribs 13,272 bytes +2,348 Created claim: summary (P836): The main aim of the project is to reintegrate 40 people at risk from the territory of the municipality of Pisz to the end of the day. 31.07.2019 by funding activation measures in the KIS. The main objective will be pursued through the specific objectives of the project: — Social integration 40 UP to dn 31.07.2019 — vocational integration 40 UP to 31.07.2019 dn 31.07.2019 — educational integration 40 UP by 40 — educational integration 31.07.2019...

25 February 2020

18 February 2020

31 January 2020

14 January 2020