Revision history of "We help redundant – comprehensive adaptive support – III edition" (Q133253)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2818:28, 9 October 2024DG Regio talk contribs 99,808 bytes −8 Changed label, description and/or aliases in pt
  • curprev 18:2818:28, 9 October 2024DG Regio talk contribs 99,816 bytes +194 Set a claim value: summary (P836): O objetivo do projeto «Ajudamos o apoio global à adaptação redundante-III edição» é manter a atividade profissional de 95 % das pessoas despedidas, ameaçadas ou despedidas por motivos relacionados com o local de trabalho no grupo 127Ki68M da sub-região de Ełckie através de um apoio global à recolocação sob a forma de aconselhamento, formação, estágios e subvenções até 30.6.2019. Em resultado do projeto, serão alcançados os seguintes resultados: —108...

7 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2420:24, 2 March 2023DG Regio talk contribs 90,398 bytes −2,349 Changed label, description and/or aliases in lv, it, da, sk, pt, lt, sv, ro, hu, de, ga, fr, bg, es, fi, el, nl, et, hr, sl, cs, mt, and other parts

3 November 2022

25 October 2022

21 October 2022

18 January 2022

15 January 2022

17 December 2021

9 December 2021

3 December 2021

2 December 2021

  • curprev 12:2212:22, 2 December 2021DG Regio talk contribs 22,762 bytes +3,019 Created claim: summary (P836): L’objectif du projet «OMAGAMY release-comprehensive adaptive support — 3e édition» est de maintenir 95 % des personnes prévues en cas de licenciement, menacées ou licenciées en raison des raisons du lieu de travail dans le groupe 127Ki68M de la sous-région d’Ełcki grâce à un soutien complet à l’extérieur sous la forme d’un soutien psychologique-conseil, de formation, de stages, de subventions jusqu’au 30 juin 2019. Grâce au projet, les résultats...
  • curprev 12:2212:22, 2 December 2021DG Regio talk contribs 19,743 bytes +129 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:3817:38, 21 October 2020DG Regio talk contribs 20,053 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3817:38, 21 October 2020DG Regio talk contribs 19,926 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3817:38, 21 October 2020DG Regio talk contribs 20,031 bytes +2,829 Created claim: summary (P836): The aim of the project “we help the redundant-comprehensive adaptation support-III edition” is to maintain the professional activity of 95 % of people provided for dismissal, threatened or dismissed due to the reasons of the workplace in group 127Ki68M from the Ełckie subregion through comprehensive outplacement support in the form of counselling support, trainings, traineeships, grants until 30.06.2019. As a result of the project, the following...
  • curprev 17:3817:38, 21 October 2020DG Regio talk contribs 17,202 bytes −2,353 Removed claim: summary (P836): The aim of the project “We are aiming for comprehensive adaptation support — III Edition” is a continuation of the labour force of 95 % of the redundancies, expected to be released, either at risk of or exempt from the root causes of the 127K-68M group from Ełk to Ełk in the form of psycholog-Advisory support, training, traineeships, subsidies until 30.06.2019. As a result of the project implementation, the following results will be achieved,...

25 September 2020

24 September 2020

15 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:2220:22, 10 March 2020DG Regio talk contribs 15,769 bytes +2,353 Created claim: summary (P836): The aim of the project “We are aiming for comprehensive adaptation support — III Edition” is a continuation of the labour force of 95 % of the redundancies, expected to be released, either at risk of or exempt from the root causes of the 127K-68M group from Ełk to Ełk in the form of psycholog-Advisory support, training, traineeships, subsidies until 30.06.2019. As a result of the project implementation, the following results will be achieved, in...

25 February 2020

18 February 2020

31 January 2020

14 January 2020