Revision history of "Improving the quality of sports infrastructure in general schools in Ostródzki county" (Q132899)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 94,579 bytes −9 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 94,588 bytes −194 Set a claim value: summary (P836): O projeto envolve a adaptação do atual, inadequado para as necessidades das partes interessadas na infraestrutura esportiva escolar em 3 escolas de nível secundário superior para o qual o Distrito de Orodzki é o órgão líder. ou seja, LO NR II na ZSZ IM.S.PETOFI W Ostróda, LO NR I na URSS e na clínica PSYCH-PEDAG. Em Morąg, LO NR II IM.L.KRUCZKOWSKI IN ZSL IN MORąG.O projeto será realizado na cidade de Ostróda e na cidade de Morąg, no distrito de Ost...

22 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2320:23, 2 March 2023DG Regio talk contribs 90,886 bytes +2,288 Changed label, description and/or aliases in da, it, lv, fi, sk, bg, cs, fr, pt, hr, hu, ro, mt, lt, sv, ga, sl, el, et, nl, es, de, and other parts

25 October 2022

24 October 2022

27 July 2022

  • curprev 17:5117:51, 27 July 2022DG Regio talk contribs 86,929 bytes +55,054 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

3 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 19,315 bytes +3,150 Created claim: summary (P836): Le projet envisage d’adapter l’actuel, inadéquat aux besoins des parties prenantes de l’infrastructure sportive scolaire dans 3 écoles secondaires supérieures pour lesquelles le district d’Ostródzki est l’organe directeur, à savoir LO NR II W ZSZ IM.S.PETOFI W Ostróda, LO NR I dans le SIGC et la clinique PSYCH-pedag. A Morąg, LO No II IM. L.KRUCZKOWSKI W ZSL IN THE SEA.Le projet sera mis en œuvre dans la ville d’Ostróda et la ville de Morąg dans...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 16,165 bytes +174 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:2016:20, 21 October 2020DG Regio talk contribs 16,430 bytes +145 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 21 October 2020DG Regio talk contribs 16,285 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 21 October 2020DG Regio talk contribs 16,428 bytes +2,825 Created claim: summary (P836): The project involves adapting the current, inadequate to the needs of stakeholders at school sports infrastructure in 3 schools at upper secondary level for which the Orodzki District is the leading body. i.e.LO NR II in the ZSZ IM.S.PETOFI W Ostróda, LO NR I in the USSR and the PSYCH- PEDAG clinic. In Morąg, LO NR II IM.L.KRUCZKOWSKI IN ZSL IN MORĄG.The project will be carried out in the city of Ostróda and the town of Morąg in the district of...
  • curprev 16:2016:20, 21 October 2020DG Regio talk contribs 13,603 bytes −1,701 Removed claim: summary (P836): The project implies an adaptation of the present, inadequate sporting infrastructure in 3 schools at an upper secondary level for which the district of the district is a a moving body. In MORGOU, LO NO II IM. The material scope of the policy analysis, diagnosis and analysis of stakeholders’ needs is: Modernisation and renovation of the Gmn.a gmn.together with the sanitary facilities in LO No 2 in ZZ Peffi at the Ostincrease in Ostda. Renovatio...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:1213:12, 10 March 2020DG Regio talk contribs 13,184 bytes +1,701 Created claim: summary (P836): The project implies an adaptation of the present, inadequate sporting infrastructure in 3 schools at an upper secondary level for which the district of the district is a a moving body. In MORGOU, LO NO II IM. The material scope of the policy analysis, diagnosis and analysis of stakeholders’ needs is: Modernisation and renovation of the Gmn.a gmn.together with the sanitary facilities in LO No 2 in ZZ Peffi at the Ostincrease in Ostda. Renovation...

25 February 2020

18 February 2020

31 January 2020

14 January 2020