8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 93,298 bytes −19 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 93,317 bytes +7 Set a claim value: summary (P836): O projeto prevê a expansão do corpo existente do Hospital, acrescentando 2 andares acima da ligação entre os edifícios A e C. O edifício será coberto com um telhado de duas etapas, erguido em pilares para comunicação sob o edifício. Construção feita da tecnologia do tijolo feita dos blocos do gasobeton com isolação da isolação do isolação do isopor. No primeiro andar, um bloco operacional está previsto para ser usado para fins de urologia e cardiolo...

22 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2320:23, 2 March 2023DG Regio talk contribs 89,775 bytes +1,025 Changed label, description and/or aliases in da, it, et, sk, fi, hr, es, lt, hu, ga, ro, fr, pt, lv, bg, sv, nl, el, de, sl, cs, mt, and other parts

24 October 2022

27 July 2022

  • curprev 17:5017:50, 27 July 2022DG Regio talk contribs 87,930 bytes +56,530 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 18,552 bytes +3,153 Created claim: summary (P836): Le projet prévoit l’extension du corps actuel de l’hôpital par l’ajout de 2 étages au-dessus du lien entre les bâtiments A et C. L’installation sera couverte d’un toit à pignon, érigé sur des piliers permettant la communication sous le bâtiment. Le bâtiment est fabriqué dans la technologie de briques de blocs de gasoton isolés avec du styrofoam. Au premier étage de l’étage, un bloc d’opération est prévu pour le service d’urologie et de cardiolog...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 15,399 bytes +213 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 15,625 bytes +190 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 15,435 bytes −222 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 15,657 bytes +2,730 Created claim: summary (P836): The project envisages the expansion of the existing body of the Hospital by adding 2 floors above the link between buildings A and C. The building will be covered with a two-step roof, erected on pillars for communication under the building. Building made of brick technology made of gasobeton blocks with styrofoam insulation. On the first floor, an operating block is planned to be used for the purposes of urology and surgical cardiology. The blo...
  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 12,927 bytes −2,352 Removed claim: summary (P836): The project envisages the extension of the existing hospital of the hospital through the construction of 2 floors above the link between buildings A and C. The Facility will be covered by a two-drop roof, built around the pillars for the communication under the building. A building made of masonry technology from gobeonic blocks with warmed styrofoam. On the first floor, an operational block is planned to be used for the purpose of a branch of...

25 September 2020

24 September 2020

15 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:1113:11, 10 March 2020DG Regio talk contribs 13,563 bytes +2,352 Created claim: summary (P836): The project envisages the extension of the existing hospital of the hospital through the construction of 2 floors above the link between buildings A and C. The Facility will be covered by a two-drop roof, built around the pillars for the communication under the building. A building made of masonry technology from gobeonic blocks with warmed styrofoam. On the first floor, an operational block is planned to be used for the purpose of a branch of u...

25 February 2020

18 February 2020

31 January 2020

14 January 2020