Revision history of "Extension, overbuilding, refurbishment of the A3 body of the Provincial Specialised Children’s Hospital in Olsztyn, on ul. Soldier 18a and purchase of equipment to adapt it to the needs of multi-specialised comprehensive treatment of children" (Q132810)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 91,887 bytes +27 Changed label, description and/or aliases in pt
  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 91,860 bytes −1 Set a claim value: summary (P836): O projeto será executado pelo candidato -Wojewódzki Specialist Children’s Hospital prof. S. Popowski em Olsztyn. Âmbito em espécie do projeto: • trabalhos preparatórios e de concepção • preparação do local • reconstrução complexa do interior da carroçaria A3 • expansão horizontal da carroçaria A3 • sobreconstrução por 1 andar de A3 e conector com a carroçaria B • trabalhos de instalação • ordenamento do território • aquisição de equipamento No bloco...

23 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2320:23, 2 March 2023DG Regio talk contribs 88,326 bytes −1,147 Changed label, description and/or aliases in it, da, lv, sk, fi, ro, pt, sl, hu, et, fr, el, sv, ga, lt, nl, cs, mt, hr, bg, de, es, and other parts

24 October 2022

2 July 2022

  • curprev 23:0723:07, 2 July 2022DG Regio talk contribs 88,651 bytes +57,118 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 18,639 bytes +3,019 Created claim: summary (P836): Le projet sera mis en œuvre par l’hôpital spécialisé pour enfants de Vojewódzki, nommé d’après le professeur S. Popowski à Olsztyn. Portée matérielle du projet: • travaux préparatoires et de conception • préparation du site • reconstruction complète de l’intérieur de la carrosserie A3 • extension horizontale de la carrosserie A3 • la superstructure avec 1 étage de la carrosserie A3 et le lien avec la carrosserie B • travaux d’installation • amén...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 15,620 bytes +310 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:0216:02, 21 October 2020DG Regio talk contribs 15,749 bytes +304 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0216:02, 21 October 2020DG Regio talk contribs 15,445 bytes −276 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0216:02, 21 October 2020DG Regio talk contribs 15,721 bytes +2,763 Created claim: summary (P836): The project will be implemented by the Applicant -Wojewódzki Specialist Children’s Hospital prof. S. Popowski in Olsztyn. In-kind scope of the project: • preparatory and design works • preparation of the site • complex reconstruction of the interior of the body A3 • horizontal expansion of the A3 body • overbuilding by 1 storey of A3 and connector with body B • installation works • land development • purchase of equipment In the target block A3...
  • curprev 16:0216:02, 21 October 2020DG Regio talk contribs 12,958 bytes −2,412 Removed claim: summary (P836): The project will be implemented by the Applicant — Regional Specialist Hospital of Professor S. Popowski in Olsztyn. Material scope of the project: • preparatory and design work• preparation of the site• Preparation of the site• Preparation of the site• Comprehensive reconstruction of the interior of the bride A3• extension of the horizontal A3 brim• construction by 1 floors of the A3 Brigade and the connector with firm B• Installation work• I...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:1113:11, 10 March 2020DG Regio talk contribs 13,654 bytes +2,412 Created claim: summary (P836): The project will be implemented by the Applicant — Regional Specialist Hospital of Professor S. Popowski in Olsztyn. Material scope of the project: • preparatory and design work• preparation of the site• Preparation of the site• Preparation of the site• Comprehensive reconstruction of the interior of the bride A3• extension of the horizontal A3 brim• construction by 1 floors of the A3 Brigade and the connector with firm B• Installation work• Ins...

25 February 2020

18 February 2020

31 January 2020

14 January 2020