Revision history of "“Securing the defensive walls”" (Q132770)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 86,906 bytes −2 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 86,908 bytes +19 Set a claim value: summary (P836): O projecto será executado em Lidzbark Warminski, ul. Carvalho e pl. Eclesiástico (partes no.: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157, 7). Âmbito do projecto: 1) Renovação da parede na ul. Carvalho, incluindo tijolos e reconstrução de fragmentos de parede, reabastecimento de cavidades e juntas, reparação de fissuras na parede, substituição de tampas de concreto do ponto culminante da parede de tijolos, remoção de vegetação, fazer uma b...

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2320:23, 2 March 2023DG Regio talk contribs 83,354 bytes +391 Changed label, description and/or aliases in da, it, sk, el, fi, pt, hr, sl, lv, et, fr, es, ga, sv, ro, mt, lt, hu, de, bg, cs, and other parts

25 October 2022

24 October 2022

2 July 2022

  • curprev 23:0723:07, 2 July 2022DG Regio talk contribs 81,281 bytes +51,971 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 20:0420:04, 2 December 2021DG Regio talk contribs 17,658 bytes +2,900 Created claim: summary (P836): Le projet sera mis en œuvre à Lidzbark Warminski, ul. Chêne et pl. Ecclésiastique (parcelles no: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157 rp.7). Portée du projet: 1) rénovation du mur sur ul. Le chêne, y compris la maçonnerie et la reconstruction de fragments de mur, la reconstitution des cavités et des soudures, la réparation des fissures face du mur, le remplacement des bouchons en béton pour terminer le mur de brique, l’enlèvemen...
  • curprev 20:0420:04, 2 December 2021DG Regio talk contribs 14,758 bytes +94 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:4815:48, 21 October 2020DG Regio talk contribs 15,103 bytes +93 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4815:48, 21 October 2020DG Regio talk contribs 15,010 bytes −90 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4815:48, 21 October 2020DG Regio talk contribs 15,100 bytes +2,730 Created claim: summary (P836): The project will be implemented in Lidzbark Warminski, ul. Oak and pl. Ecclesiastical (parts no.: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157, 7). Scope of the project: 1) renovation of the wall on ul. Oak, including bricking and rebuilding of wall fragments, replenishment of cavities and joints, repair of wall cracks, replacement of concrete caps of the culmination of the brick wall, removal of greenery, making a band from a stone cub...
  • curprev 15:4815:48, 21 October 2020DG Regio talk contribs 12,370 bytes −2,248 Removed claim: summary (P836): The project will be carried out by ul. Oak and plume Ecclesiastical (parcels No: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157 to.7.). Scope of the project: 1) renovation of the wall at ul. The hermit beetle, including the reconstruction and reconstruction of the wall of the wall, completion of loss and weld, repair of the wall fracture of the wall, concrete replacement of the wall on the brick, removal of greenery, construction of the...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:1313:13, 10 March 2020DG Regio talk contribs 12,903 bytes +2,248 Created claim: summary (P836): The project will be carried out by ul. Oak and plume Ecclesiastical (parcels No: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157 to.7.). Scope of the project: 1) renovation of the wall at ul. The hermit beetle, including the reconstruction and reconstruction of the wall of the wall, completion of loss and weld, repair of the wall fracture of the wall, concrete replacement of the wall on the brick, removal of greenery, construction of the s...

25 February 2020

18 February 2020

31 January 2020

14 January 2020